Strategy and Planning Committee Agenda 16 February 2011<br />

Pedestrian Bridges<br />

The Planning Scheme emphasises the importance of permeable street networks and high<br />

quality pedestrian and cycle links between major nodes to encourage pedestrian and cyclist<br />

use. The proposed lake creates a significant barrier to pedestrian and cyclist movement<br />

through this community. The applicant has agreed to the provision of two pedestrian/cycle<br />

bridges across the lake in order to improve pedestrian/cycle permeability.<br />

Walkable Waterfront<br />

The extent of the walkable waterfront extends from the existing Pelican Waters shopping<br />

centre and tavern past the proposed marina and around approximately half of the central<br />

island. The inclusion of the two pedestrian/cycle bridges further improves the circulation of<br />

the network and provides safe and convenient access to central island, town centre and<br />

coastal path for the greater Pelican Waters and Golden Beach (Diamond Head) community.<br />

<strong>Coast</strong>al Path<br />

The Pelican Waters development is the southern extent of the former Caloundra <strong>Council</strong>’s<br />

coastal path network. The development of this land will complete the network from Pelican<br />

Waters to the northern end of Golden Beach.<br />

The applicant proposes an extension of the coastal path network from the recently approved<br />

Boronia Grove layout terminating at the south western corner of Lot 431 CG 2549. The<br />

applicant indicates the recommencement of the pathway from the south eastern corner of Lot<br />

431 CG 2549 through to the existing path network at Jensen Park, thus resulting in an<br />

uncompleted section adjacent to the southern boundary of Lot 431 CG 2549.<br />

This outcome is unacceptable as the coastal path would be complete but for approximately<br />

400 metres to adjacent land currently zoned rural. The construction of the pathway is<br />

possible as there is an existing road reserve within which the pathway is to be located. The<br />

minimum expectation is that the applicant complete this coastal pathway and be credited the<br />

full cost of these works against their general contributions for pathways in accordance with<br />

<strong>Council</strong>’s adopted Policy.<br />

The applicant has proposed a connection to a “nature walk” within the Jensen Park<br />

extension, this proposal is not supported due to Crime Prevention through Environmental<br />

Design concerns, maintenance issues and increased exposure to biting insects. A<br />

boardwalk section over the channel along the alignment of the existing causeway crossing is<br />

acceptable. With regard to impact on mapped vegetation, the applicant has submitted that<br />

the coastal path will be aligned within the proposed east west collector road reserve.<br />

Water and Sewerage considerations<br />

Unitywater have assessed the proposal and provided conditions for inclusion in the<br />

development permit, should the proposal be supported.<br />

Conditions relate to the provision of reticulated water and sewerage being provided in<br />

accordance with the Water Supply and Sewerage Infrastructure Assessment dated 11<br />

August 2010 prepared by Cardno Pty Ltd. There are also requirements for a number of<br />

pump stations to be upgraded based on sewerage inflow loading reaching predetermined<br />

Equivalent Person (EP) counts.<br />