03.09.2014 Views

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Strategy and Planning Committee Agenda 16 February 2011<br />

STORMWATER<br />

13 Future owners of the proposed lots must incorporate drainage measures into the<br />

design of future dwellings and associated landscaping and engineering works on the<br />

site to accommodate stormwater flows from upstream properties without causing a<br />

nuisance to adjoining properties.<br />

UNITYWATER<br />

14 Reticulated water must be provided to each lot in the development. This must include:<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

ensuring that existing internal water pipes are wholly contained within the lot<br />

they will serve;<br />

an approved water meter for each lot in accordance with Unitywater Standard<br />

Drawings SCW 350,355 and 360;<br />

provision of a water service from the existing 100mm diameter water main<br />

located Nothling Street to service the proposed lots, in accordance with<br />

Unitywater Standard Drawings SCW 350, 355 and 360;<br />

water meters must be located on alternative boundaries to electrical pillars.<br />

15 Reticulated sewerage must be provided to each lot in the development. This must<br />

include:<br />

(a)<br />

Ensuring existing sewer house drains are wholly contained within the Lot they<br />

will serve.<br />

16 Stormwater retention systems and gross pollutant traps must maintain a minimum<br />

clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.<br />

17 Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from<br />

Unitywater water mains and 1.5 metres from Unitywater sewerage mains.<br />

Landscaping plants within these clearances must be low growing when mature and<br />

suitable Unitywater approved varieties.<br />

18 Construction works undertaken in the vicinity of Unitywater water supply or sewerage<br />

infrastructure must not adversely affect the integrity of the infrastructure. All costs<br />

associated with repair, replacement or alteration of infrastructure must be met by the<br />

applicant.<br />

GENERAL<br />

19 All conditions of this approval are to be complied with prior to the endorsement of<br />

approval of the relevant Plan of Subdivision unless otherwise stated.<br />

REFERRAL AGENCIES<br />

Not Applicable<br />

PLANS / DOCUMENTS<br />

The approved plans and / or documents for this development approval are listed in the<br />

following tables:<br />

Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!