03.09.2014 Views

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

AGENDA - Sunshine Coast Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Strategy and Planning Committee Agenda 16 February 2011<br />

(vii)<br />

(viii)<br />

• Protocol for containment of unauthorised spills (i.e. fuel<br />

spills/sewerage pump out spills);<br />

• Incident response and reporting;<br />

Maintenance Manual for waterway and related infrastructure;<br />

Design Details:<br />

• A summary of the design data and assumptions used for the<br />

hydrological study;<br />

• A summary of the design flows, tidal exchange and predicted<br />

operating water levels and variations;<br />

• Summary hydraulic calculations for the design of all inlet and<br />

outlet structures;<br />

• A summary of the design pollutant loadings and modelling<br />

assumptions used to derive the design pollutant loadings;<br />

• A summary of the design performance criteria;<br />

• A summary of the predicted water quality outcomes.<br />

27. The Lake Management Plan and Tidal Waterway Management Plan must be updated<br />

by the developer and approved by <strong>Council</strong> to address the following issues prior to<br />

dedication of each stage of the lake/canal/marina system:<br />

• ‘As constructed’ plans showing relevant details and levels for<br />

all components of the system;<br />

• A summary of water quality test results obtained prior to hand<br />

over to <strong>Council</strong>;<br />

• A brief comparison and discussion of the possible reasons for<br />

any difference between predicted and actual results of the<br />

water quality monitoring along with management<br />

recommendations to mitigate unacceptable results;<br />

• Briefing notes suitable for maintenance personnel sufficient to<br />

satisfy any known Occupational Health and Safety issues<br />

related to the ongoing management of the site;<br />

• A summary checklist, including a timetable, for the routine<br />

inspection and maintenance of all elements of the system.<br />

A summary of staff, plant, minor and special equipment and costing information<br />

associated with the previous operation and maintenance of the system to allow<br />

budget preparation for future management and maintenance to be tailored to levels of<br />

service;<br />

HYDRAULICS AND WATER QUALITY<br />

28. The following minimum development levels will be achieved for the development<br />

associated with this Preliminary Approval:<br />

• Minimum floor level is 3.2 m Australian Height Datum;<br />

• Minimum fill platform level is 2.9 m Australian Height Datum;<br />

• Minimum road centreline level is 2.4 m Australian Height Datum. For<br />

roads with a centre median, the high point on one traffic lane shall<br />

have a minimum level of 2.4m Australian Height Datum;<br />

• Minimum revetment wall level is 1.75 m Australian Height Datum;<br />

• Minimum level of base of filter media in bioretention devices is 1.25 m<br />

Australian Height Datum<br />

Page 85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!