111-10<br />

PRO-FORMA CALCULATIONS FOR ELECTRODIALYSIS REVERSAL PROCESS (EDR)<br />

Cost Elements<br />

Capital<br />

Costs/{Sx 10(0)<br />

Annual<br />

Costs/Ix 1 000)<br />

<strong>Water</strong> Costs,<br />

S/l.OOOn'<br />

Capital Costs<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

Plant and Equipment(2)<br />

Feedwater Pretreatment(2)<br />

Feedwater <strong>Supply</strong>Ol<br />

<strong>Water</strong> Transmission<br />

Br<strong>in</strong>e Disposal<br />

4 925<br />

600<br />

l.6OO<br />

780<br />

1.388<br />

446·94<br />

54.45<br />

145.20<br />

70.79<br />

125.96<br />

02709<br />

0.0330<br />

0.0880<br />

0.0429<br />

0.0763<br />

Total Capital Costs<br />

$ 9,293.00<br />

$ 843.34<br />

$ 0.511 1<br />

Operation and Ma<strong>in</strong>tenance Costs<br />

6. Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

a. Plant and Equipment(2)<br />

b. Feedwater Pretreatment<br />

c. Feedwater <strong>Supply</strong><br />

d. <strong>Water</strong> Transmission<br />

e. Br<strong>in</strong>e Disposal<br />

$/1.000 gal.<br />

0.050<br />

0.036<br />

0.026<br />

n.r. (I)<br />

0.200<br />

Total Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

$ 0.312<br />

7.<br />

O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

a. Payroll Extras (15% of 6a)<br />

b. General and Adm<strong>in</strong>istrative Overhead (30% of 6a + 7a)<br />

c. Supplies and Ma<strong>in</strong>tenance Materials<br />

d. Membrane Assembly or Replacement Tub<strong>in</strong>g(2)<br />

e. Chemicals(2)<br />

f. Fuel or Steam<br />

g. Electric Power<br />

Plant and Equipment(2)<br />

Feedwater <strong>Supply</strong><br />

<strong>Water</strong> Transmission<br />

0.008<br />

0.017<br />

0.030<br />

0.200<br />

0.030<br />

n.r!)<br />

0.392<br />

0.108<br />

n.r!)<br />

Total O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

$ 0.785<br />

Total Operation and Ma<strong>in</strong>tenance Costs<br />

$ 1.097<br />

Total <strong>Water</strong> Cost (fotal Capital Plus O. & M. Costs)<br />

$ 1.6081<br />

(1) none required<br />

(2) Bued on recent <strong>in</strong><strong>for</strong>mation from lonics, Inc., with an assumed water recovery factor of 80% and add<strong>in</strong>g a factor of 20% to cover<br />

<strong>in</strong>direct capital costs comprised of <strong>in</strong>terest dur<strong>in</strong>g construction, eng<strong>in</strong>eer<strong>in</strong>g and cont<strong>in</strong>gencies, and factor <strong>for</strong> land costs.<br />

(3) Based on a recent study by R.W. Harden Assoc. Total of 10 wells and a land cost factor