11.10.2014 Views

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GROUP 1 CONDITIONS<br />

195,000 gpd bypass water<br />

..<br />

....<br />

.<br />

1.225 mgd wellwater<br />

RO BLENDING RATIO = .805 / .195<br />

1.00 mgd pr educt<br />

... ....<br />

,<br />

'IDS = 500 P<br />

TFC RO UNIT<br />

... ...<br />

82.5%<br />

975,000 gp:i<br />

<strong>Water</strong> Recovery<br />

'IDS = 2177 ppm<br />

805,000 gpd<br />

'IDS = 87 ppm<br />

RO<br />

-----<br />

BRINE<br />

" Flow 170,750 gpd<br />

'IDS 12 , 440 ppn<br />

Si02 = 185 ppm<br />

1.136 mgd wellwater<br />

...<br />

EDR BASED SYSTEM<br />

88%<br />

WATER REXXNERY<br />

1.000 mgd product<br />

.....<br />

....<br />

'IDS = 500 ppm<br />

EDR BRINE<br />

-----<br />

Flow = 136,000 gpd<br />

'IDS = 20,657 ppm (steady-state)<br />

= 14,497 ppm (averaged)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!