11.10.2014 Views

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Des/ON • CONS(.Jl..rINQ • F,A.SRIC,A.TION • !NS-r.... I..L.4.T:ON<br />

COMPI..EiE GREENHOUSE SYSTeMS<br />

PAUL LIENAU<br />

Geo-Heat Center<br />

Oregon Institute of Techr.ology<br />

3201 Campus Drive<br />

~lamat~ Falls, Oregon 97601<br />

~OPO;SAI.<br />

!II<br />

19 July 1990<br />

C~~BELL C:~SSHOUSES, proposes to provide materials and <strong>in</strong>stallation<br />

labor <strong>for</strong> <strong>the</strong> follow<strong>in</strong>g facility to be built <strong>in</strong> Texas:<br />

ST!UICTL'"RES:<br />

GLAZING:<br />

COOLING:<br />

HEATI:iG:<br />

DOOR:<br />

FREIGHT:<br />

TOTAL PRICE:<br />

TER.'1S:<br />

ACCEP'!.~'TCE :<br />

One (1) Service Build<strong>in</strong>g, SO' X 84'<br />

Total square footage a 4,200<br />

Gutters to be set 14' above grade. Trusses to be set<br />

on 12' centers. Eleven (11) runs of roof l)urli:J.s.<br />

All surfaces to be glazed with 26 gao cor=ugated<br />

s ted panels.<br />

Not <strong>in</strong>cluded <strong>in</strong> quotation.<br />

Not <strong>in</strong>cluded In quotation.<br />

One la' x 12' overhead door to be provicec.<br />

F.O.B. prepaid to joosite.<br />

$ 42,000<br />

Mutually acceptable terms to be arranged.<br />

OREGON INST!TUTE OF TECHNOLOGY<br />

DA'!'E<br />

J es A. Cam~bel , ?resicent<br />

~'1?BELL GLASSHOUSES<br />

D-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!