11.10.2014 Views

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRO-FORMA CALCULATIONS FOR REVERSE OSMOSIS PROCESS (RO)<br />

Cost Elements Costs/yr.C$x 1 000)<br />

Capital Costs<br />

1. Plant and Equipment(2)<br />

2. Feedwater Pretreatment<br />

3. Feedwater <strong>Supply</strong>O)<br />

4. <strong>Water</strong> Transmission<br />

5. Br<strong>in</strong>e Disposal<br />

4.505<br />

o<br />

1.600<br />

780<br />

1.735.3<br />

Costs/yr. ($x 10(0)<br />

408.83<br />

o<br />

145.20<br />

70.79<br />

157.48<br />

<strong>Water</strong> Costs,<br />

$/1.000 gal.<br />

.2478<br />

o<br />

.0880<br />

.0429<br />

.0954<br />

Total Capital Costs<br />

$ 8,620.3<br />

$ 782.3<br />

$ .4741<br />

Operation and Ma<strong>in</strong>tenance Costs<br />

6, Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

a, Plant and Equipment(3)<br />

b, Feedwater Pretreatment<br />

c. Feedwater <strong>Supply</strong><br />

d. <strong>Water</strong> Transmission<br />

e. Br<strong>in</strong>e Disposal<br />

$/1.000 gal,<br />

,05<br />

o<br />

,026<br />

n.r.(l)<br />

.19<br />

Total Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

$ .266<br />

7, O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

a. Payroll Extras (15% of 6a)<br />

b. General and Adm<strong>in</strong>istrative Overhead (30% of 6a + 7a)<br />

c. Supplies and Ma<strong>in</strong>tenance Materials<br />

d. Membrane Assembly or Replacement Tub<strong>in</strong>g(2)<br />

e. Chemicals(2)<br />

f. Fuel or Stearn<br />

g.<br />

Electric Power<br />

Plant and Equipment(2)<br />

Feedwater <strong>Supply</strong><br />

<strong>Water</strong> Transmission<br />

.008<br />

.017<br />

.028<br />

.23<br />

.075<br />

n.r(1)<br />

.28<br />

.108<br />

n.r(l)<br />

Total O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

$ .746<br />

Total Operation and Ma<strong>in</strong>tenance Costs<br />

$ 1.012<br />

Total <strong>Water</strong> Cost (Total Capital Plus O. & M. Costs)<br />

$ 1.4861<br />

(1) none required<br />

(2) Based on recent <strong>in</strong><strong>for</strong>mation from Ionics, Inc., cost <strong>in</strong>fonnation <strong>in</strong>cludes effect of 83%/17% blend<strong>in</strong>g; <strong>the</strong>re<strong>for</strong>e, actual plant size equal<br />

to 4.2 MGD, with Th<strong>in</strong> Film Composite (TFC) membranes and a water recovery factor of 75%. A factor of 20% has been added to cover<br />

<strong>in</strong>direct capital costs comprised of <strong>in</strong>terest dur<strong>in</strong>g construction, eng<strong>in</strong>eer<strong>in</strong>g and cont<strong>in</strong>gencies. Also, a factor has been added <strong>for</strong> land cost.<br />

(3) Based on a recent study by R.W. Harden Assoc. Total of 10 wells and a land cost factor added.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!