11.10.2014 Views

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

lli41<br />

EXHIBIT IIID-3<br />

PRO-FORMA CALCULATIONS FOR ELECTRODIALYSIS REVERSAL PROCESS (EDR)<br />

USING <strong>GP</strong>I<strong>GT</strong> POWER @ $O.Q32lKWHR<br />

Cost Elements<br />

Capital<br />

COSts/($x 1(00)<br />

Annual<br />

COSts/($x 1()()Q)<br />

<strong>Water</strong> Costs,<br />

$/1.000 gal.<br />

Capital Costs<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

Plant and Equipment(2)<br />

Feedwater Pretreatment<br />

Feedwater <strong>Supply</strong>O><br />

<strong>Water</strong> Transmission<br />

Br<strong>in</strong>e Disposal<br />

$5.640<br />

1.600<br />

780<br />

1.096<br />

$646.75<br />

n.r(l)<br />

183.48<br />

89.44<br />

125.68<br />

$0.392<br />

n.r.(1)<br />

0.111<br />

0.054<br />

0.076<br />

Total Capital Costs<br />

$ 9.116.09<br />

$ 1,045.35<br />

$ 0.633<br />

Operation and Ma<strong>in</strong>tenance Costs<br />

6. Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

a. Plant and Equipment(2)<br />

b. Feedwater Pretreatment<br />

c. Feedwater <strong>Supply</strong><br />

d. <strong>Water</strong> Transmission<br />

e. Br<strong>in</strong>e Disposal<br />

Total Operat<strong>in</strong>g and Ma<strong>in</strong>tenance Labor<br />

$/1 000 gal.<br />

. 0.052<br />

o<br />

0.026<br />

n.r.(1)<br />

0.22<br />

$ 0.298<br />

7.<br />

O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

a. Payroll Extras (15% of 6a)<br />

b. General and Adm<strong>in</strong>istrative Overhead (30% of6a + 7a)<br />

c. Supplies and Ma<strong>in</strong>tenance Materials<br />

d. Membrane Assembly or Replacement Tub<strong>in</strong>g(2)<br />

e. Chemicals(2)<br />

f. Fuel or Steam<br />

g. Electric Power<br />

Plant and Equipment(2)<br />

Feedwater <strong>Supply</strong><br />

<strong>Water</strong> Transmission<br />

0.098<br />

0.018<br />

0.030<br />

0.16<br />

0.0225<br />

n.r(l)<br />

o<br />

.1264<br />

.0465<br />

n. t l )<br />

Total O<strong>the</strong>r Operation and Ma<strong>in</strong>tenance Costs<br />

Total Operation and Ma<strong>in</strong>tenance Costs<br />

Total <strong>Water</strong> Cost (Total Capital Plus O. & M. Costs)<br />

$ 0.4114<br />

$ .7094<br />

$ 1.3424

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!