11.10.2014 Views

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

(GP/GT) for Additional Water Supply in the Lower Rio Grande

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 3.<br />

Agriculture/aquaculture first Phase Cost Estimate<br />

Greenhouse/Pad House (51,156 ft2)<br />

Service Build<strong>in</strong>g (4,200 ft2)<br />

Mechanical Equipment (Heat exchanger,<br />

Aquaculture Enclosed Facility<br />

Aquaculture Outdoor Raceway<br />

15% Overhead and Profit<br />

20% Cont<strong>in</strong>gency<br />

TOTAL<br />

etc. )<br />

$352,600<br />

43,300<br />

11,900<br />

90,700<br />

16,300<br />

77 ,000<br />

10Z.7QO<br />

$694,500<br />

Note:<br />

Well development costs are addressed separately<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!