15.11.2014 Views

ssc-367 - Ship Structure Committee

ssc-367 - Ship Structure Committee

ssc-367 - Ship Structure Committee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T: v.<br />

Visually Observed Period, or Mean Period, or Apparent<br />

Period<br />

The visually observed period is the centroid of the S(u) spectrum.<br />

The International <strong>Ship</strong> <strong>Structure</strong>s Congress (ISSC) and some<br />

environmental reporting agencies have adopted Tv as the period<br />

visually estimated by observers.<br />

Tv = 2~*(mo/m2) 4<br />

Tz :<br />

Average Zero-uncrossing period or Average Period<br />

The average zero-uncrossing period is the average period between<br />

successive zero up-crossings. The average period may be obtained<br />

from a wave record with reasonable accuracy.<br />

Tz<br />

= 2n*(mo/mz) 4<br />

Tc :<br />

Crest Period<br />

The crest period is the average period between successive crests.<br />

The crest period may be taken from a wave record, but its accuracy is<br />

dependent upon the resolution of the wave measurement and recording<br />

equipment and the sampling rate.<br />

Tc<br />

= 2~*(mz/mq) %<br />

T5:<br />

Significant<br />

Period<br />

The significantperiod is the average period of the highest one-third<br />

of the waves. Some environmental reporting agencies give the sea<br />

characteristicsusing Ts and Hs, the significant wave height. There<br />

are two equations relating Ts to Tp.<br />

Ts = 0.8568*TP, Old<br />

A-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!