27.11.2014 Views

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BaseStation</strong> <strong>3200</strong> Advanced Irrigation Controller <strong>Manual</strong><br />

7 – FLOW MANAGEMENT & MONITORING<br />

The <strong>BaseStation</strong> <strong>3200</strong> provides an extensive set of flow monitoring and management capabilities to help<br />

understand how water is being used and to reduce the effects of pipeline breaks and sprinkler malfunctions. It can<br />

monitor actual water flow rates and compare them against the expected or<br />

design flow rates and provide alerts and perform actions when limits or<br />

boundaries are exceeded. The system can reduce the overall completion<br />

time of a watering cycle by running the number of zones that best use the<br />

available water at each minute of the watering cycle.<br />

To access the main menu for flow management, turn the dial to the Flow<br />

Menu position.<br />

Using a flow device to monitor water flow rates and water used is the best<br />

way to manage this precious resource, but even without a flow device, the<br />

<strong>BaseStation</strong> <strong>3200</strong> has many capabilities that can improve the efficiency of your system.<br />

Configuring a Flow Device<br />

1. Search for the flow device.<br />

a. Turn the dial to the Flow Menu position.<br />

b. Press the NEXT or PREV button to select Flow Device Setup.<br />

c. Press the ENTR button. The Flow Device Setup screen displays.<br />

d. Press the + or – button until Search displays<br />

in the Configure Flow Device field.<br />

e. Press the ENTR button to search for flow<br />

biCoders. The system indicates how many<br />

flow devices it finds.<br />

2. Press the + or – button to move through the list<br />

of flow devices, and stop when the serial<br />

number of the flow device that you want to set<br />

up displays in the field.<br />

Note: The system assigns a number from 1 to 4<br />

to each flow device in the order that they are<br />

found. This number is used when programming the flow device or when referring to the flow device from<br />

other menus.<br />

3. Press the NEXT button to move to the Enable field, and then press the + or – button to select either Yes or No.<br />

Note: If the flow biCoder is disabled, it will not be used in high flow checking, but it will continue to<br />

accumulate data about the amount of water used.<br />

4. Press the NEXT button to move to the Use Internal NOMV field. If the flow device that you are setting up has<br />

a normally open master valve (NOMV), you can enable it by pressing the +/– buttons. If the flow device does<br />

not have an NOMV, the field displays “na” to indicate that the setting does not apply.<br />

Page 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!