27.11.2014 Views

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

BaseStation 3200 User Manual – 11.7.5.15 ... - Baseline Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BaseStation</strong> <strong>3200</strong> Advanced Irrigation Controller <strong>Manual</strong><br />

• Monthly Budget – When the value in this field is greater than zero, the system monitors the total water used<br />

during a single month.<br />

If the monthly water used exceeds this number, an alert is generated. If you set the Shut Down field to Y (yes),<br />

then the associated MVs shut off and water is stopped until the first of the next month.<br />

To configure the flow device limits<br />

1. Turn the dial to the Flow Menu position.<br />

2. Press the NEXT button to select Flow Device Limits, and then press the<br />

ENTR button. The Flow Device Limits screen displays.<br />

3. If the device in the Flow Device field is not the one that you want to<br />

configure, press the + or – button to select a different flow device.<br />

4. Press the NEXT button to go to the Design Flow field, and then press<br />

the + button to enter the amount of flow in gallons per minute (GPM)<br />

that is allowed through the point of connection for the irrigation<br />

system.<br />

Note: Press and hold the + button or the - button to rapidly increase or decrease the number in the field.<br />

5. Press the NEXT button to go to the High Flow Limit field, and then press the + button to enter the maximum<br />

amount of flow in gallons per minute.<br />

6. Press the NEXT button to go to the Shut Down field. If you want programs using this POC to be stopped and<br />

corresponding MVs shut off when the flow rate exceeds the limit, press the + button to enter a Y (yes) in the<br />

field. If you do not want excessive flow to shut down the system, leave the – in the field.<br />

Note: If you want to exit the Flow Device Limits screen, press the CLR button.<br />

7. Press the NEXT button to go to the Unscheduled Flow Limit field, and then press the + button to enter the<br />

maximum amount of unscheduled flow in gallons per minute.<br />

8. Press the NEXT button to go to the Shut Down field. If you want the associated MVs to turn off when an<br />

unscheduled flow exceeds this limit, press the + button to enter a Y (yes) in the field. If you do not want<br />

excessive flow to shut down the system, leave the – in the field.<br />

9. Press the NEXT button to go to the Monthly Budget field, and then press the + button to enter the maximum<br />

amount of water that can be used per month in gallons.<br />

10. Press the NEXT button to go to the Shut Down field. If you want the associated MVs to turn off when the<br />

amount of water used exceeds this limit, press the + button to enter a Y (yes) in the field. If you do not want<br />

excessive water use to shut down the system, leave the – in the field.<br />

11. When you have finished making changes, turn the dial to the Auto Run position.<br />

Mainline Setup<br />

The <strong>BaseStation</strong> <strong>3200</strong> supports four mainlines. By default, the mainlines are numbered in the controller from 1 – 4<br />

regardless of whether your system has more than one. All programs and flow devices are automatically assigned to<br />

mainline #1, but you can change the settings to match your irrigation system. For more information about<br />

changing how the mainlines are associated with your programs and flow devices, refer to Multiple Flow Devices<br />

and Mainlines on page 64.<br />

The mainline is the primary water management feature in your irrigation system. In the <strong>BaseStation</strong> <strong>3200</strong>, you can<br />

configure the following settings for the mainline in order to better manage flow in your irrigation system.<br />

Note: The step-by-step procedure for setting up the mainline is on page 61.<br />

Page 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!