A preliminary recommended program was used to identify activities that were subject to an<br />
independent technical evaluation and cost estimate. <strong>The</strong> panel’s final recommendation to the Survey<br />
Committee included consideration <strong>of</strong> the results <strong>of</strong> the independent technical evaluation and cost estimate.<br />
Each PPP provided the Survey Committee with an interim internal and confidential summary report <strong>of</strong> its<br />
recommended program in the Fall <strong>of</strong> 2009 and complete its panel report thereafter. <strong>The</strong> panel reports are<br />
published in the second volume <strong>of</strong> the decadal survey along with the reports <strong>of</strong> the Science Frontiers<br />
Panels.<br />
<strong>The</strong> main results from the four PPPs are summarized in Table B.1.<br />
Table B.1 Summary <strong>of</strong> Priority Activities as Recommended by the Program Prioritization Panels.<br />
EOS Project PAG Project RMS Project OIR Project<br />
Program<br />
Cost<br />
Appraisal<br />
(category)<br />
Program<br />
Cost<br />
Appraisal<br />
(category)<br />
Program<br />
Cost<br />
Appraisal<br />
(category)<br />
(1) WFIRST $1.5B (L) (1) LISA $1.5B (L) (1) HERA‐I and $25M +<br />
HERA‐II<br />
$85M (M)<br />
(2) IXO $1.0B (L) (2) ACTA (AGIS) $0.2B (L) (2) FASR $100M (M)<br />
(project start)<br />
(2) CCAT $110M (M)<br />
(3) Exoplanet<br />
Mission<br />
$0.7B (L)<br />
(1) Pulsar Timing<br />
Array for<br />
Gravitational Wave<br />
Detection<br />
(1) BLISS $0.2B (M) (1) NASA Explorer<br />
Augmentation<br />
(2) Explorer $0.5B (M) (2) Technology<br />
development<br />
augmentation and<br />
ULDB R&D and<br />
augmentation<br />
$70M (M) ATA<br />
Enhancement<br />
$1B (M) Enhancements<br />
to GBT, EVLA,<br />
VLBA, ALMA,<br />
Enhancements<br />
to CARMA,<br />
EHT<br />
$550M<br />
NASA (M),<br />
$150M<br />
NSF+DOE<br />
(M)<br />
(3) R&A $0.2B (M) (3) Auger North $60M (US<br />
portion) (M)<br />
Program<br />
Cost<br />
Appraisal<br />
(category)<br />
(1) GSMT ≥$1B (L)<br />
(2) LSST $460M (L)<br />
$44M (M) (1) Mid‐scale NSF<br />
program<br />
augmentation<br />
(OIR+PAG+RMS)<br />
$120M (2) TSIP<br />
augmentation<br />
$25M<br />
‐‐‐ ‐‐‐ (2) OIR System<br />
augmentation<br />
‐‐‐ ‐‐‐ Small,<br />
unprioritized<br />
programs<br />
$200M<br />
$40M (M)<br />
$61M (M)<br />
$100M<br />
NOTE: Entries under each panel are in priority order within size category. Note that the RMS panel has<br />
two second equal priorities. <strong>The</strong> EOS costs are shown for the panel’s enhanced budget scenario. <strong>The</strong><br />
tabulated costs are in FY2010 dollars and are estimates for the decade.<br />
PREPUBLICATION COPY—SUBJECT TO FURTHER EDITORIAL CORRECTION<br />
B-2