A preliminary recommended program was used to identify activities that were subject to an<br />

independent technical evaluation and cost estimate. <strong>The</strong> panel’s final recommendation to the Survey<br />

Committee included consideration <strong>of</strong> the results <strong>of</strong> the independent technical evaluation and cost estimate.<br />

Each PPP provided the Survey Committee with an interim internal and confidential summary report <strong>of</strong> its<br />

recommended program in the Fall <strong>of</strong> 2009 and complete its panel report thereafter. <strong>The</strong> panel reports are<br />

published in the second volume <strong>of</strong> the decadal survey along with the reports <strong>of</strong> the Science Frontiers<br />

Panels.<br />

<strong>The</strong> main results from the four PPPs are summarized in Table B.1.<br />

Table B.1 Summary <strong>of</strong> Priority Activities as Recommended by the Program Prioritization Panels.<br />

EOS Project PAG Project RMS Project OIR Project<br />

Program<br />

Cost<br />

Appraisal<br />

(category)<br />

Program<br />

Cost<br />

Appraisal<br />

(category)<br />

Program<br />

Cost<br />

Appraisal<br />

(category)<br />

(1) WFIRST $1.5B (L) (1) LISA $1.5B (L) (1) HERA‐I and $25M +<br />

HERA‐II<br />

$85M (M)<br />

(2) IXO $1.0B (L) (2) ACTA (AGIS) $0.2B (L) (2) FASR $100M (M)<br />

(project start)<br />

(2) CCAT $110M (M)<br />

(3) Exoplanet<br />

Mission<br />

$0.7B (L)<br />

(1) Pulsar Timing<br />

Array for<br />

Gravitational Wave<br />

Detection<br />

(1) BLISS $0.2B (M) (1) NASA Explorer<br />

Augmentation<br />

(2) Explorer $0.5B (M) (2) Technology<br />

development<br />

augmentation and<br />

ULDB R&D and<br />

augmentation<br />

$70M (M) ATA<br />

Enhancement<br />

$1B (M) Enhancements<br />

to GBT, EVLA,<br />

VLBA, ALMA,<br />

Enhancements<br />

to CARMA,<br />

EHT<br />

$550M<br />

NASA (M),<br />

$150M<br />

NSF+DOE<br />

(M)<br />

(3) R&A $0.2B (M) (3) Auger North $60M (US<br />

portion) (M)<br />

Program<br />

Cost<br />

Appraisal<br />

(category)<br />

(1) GSMT ≥$1B (L)<br />

(2) LSST $460M (L)<br />

$44M (M) (1) Mid‐scale NSF<br />

program<br />

augmentation<br />

(OIR+PAG+RMS)<br />

$120M (2) TSIP<br />

augmentation<br />

$25M<br />

‐‐‐ ‐‐‐ (2) OIR System<br />

augmentation<br />

‐‐‐ ‐‐‐ Small,<br />

unprioritized<br />

programs<br />

$200M<br />

$40M (M)<br />

$61M (M)<br />

$100M<br />

NOTE: Entries under each panel are in priority order within size category. Note that the RMS panel has<br />

two second equal priorities. <strong>The</strong> EOS costs are shown for the panel’s enhanced budget scenario. <strong>The</strong><br />

tabulated costs are in FY2010 dollars and are estimates for the decade.<br />