03.01.2015 Views

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Public Works/Fire Station Construction Fund (335)<br />

2008-09 2009-10 2010-11 2010-11 <strong>2011</strong>-<strong>12</strong><br />

EXPENDITURES Actual Actual <strong>Budget</strong> Projection <strong>Budget</strong><br />

Public Works Complex<br />

Engineering/Design 28,057 0 0 57,630 0<br />

Impact Fees/Electrical Svcs./Miscellaneous 3,464 65,190 0 0 0<br />

Land Acquisition and Related Costs 0 0 0 0 0<br />

Admin./Engineering Building 1,142,933 110,801 0 0 0<br />

Fleet Maintenance Bldg. Renovation 0 4,110 700,000 544,269 0<br />

Automated Vehicle Wash System 0 0 <strong>12</strong>0,000 0 71,268<br />

Allowance for Building Renovations 0 0 65,000 0 71,678<br />

Equipment and Material Storage Bays 0 0 200,000 0 173,000<br />

Furniture, Fixtures and Equipment:<br />

- PWA Bldg. 83,918 0 0 0 0<br />

- Fleet Maintenance Bldg. 0 0 82,000 41,000 52,865<br />

Sub-Total: PW Complex 1,258,372 180,101 1,167,000 642,899 368,811<br />

Interfund Transfers (transfers to):<br />

Administrative Facilities Impact Fee Fund (101) 0 0 180,674 181,939 0<br />

General Facilities Improvements Fund (330) 140,992 0 0 0 0<br />

Sub-Total: Interfund Transfers 140,992 0 180,674 181,939 0<br />

Reserve for Contingency 0 76,800<br />

TOTAL EXPENDITURES 2,956,342 182,045 1,388,104 865,268 445,611<br />

Ending Fund Balance 49 943 943 445,611 76,800<br />

110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!