03.01.2015 Views

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EXPENDITURE AND STAFFING SUMMARY<br />

Department<br />

Program<br />

Public Works Engineering<br />

2008-09 2009-10 2010-11 2010-11 <strong>2011</strong>-<strong>12</strong><br />

Account Category Actual Actual <strong>Budget</strong> Projection <strong>Budget</strong><br />

Salaries & Wages 439,349 352,3<strong>12</strong> 290,108 286,924 213,819<br />

Benefits 114,109 102,663 75,954 77,361 54,757<br />

Total: Personal Services 553,458 454,975 366,062 364,284 268,576<br />

Pr<strong>of</strong>essional & Contractual Services 32,694 4,455 20,000 7,574 15,000<br />

Communications 8,801 7,425 7,893 7,038 6,194<br />

Utilities 6,886 9,339 9,922 18,180 13,364<br />

Rentals & Leases 23,284 1,226 2,549 1,561 1,661<br />

Insurance 7,032 5,133 3,710 3,708 2,810<br />

Repair & Maintenance 7,724 2,298 2,892 800 600<br />

Operating Supplies 9,359 5,145 8,544 6,537 4,175<br />

Fuel 4,200 4,072 5,387 2,262 2,420<br />

Miscellaneous (Travel, Training, Dues, etc.) 4,616 3,623 5,724 7,374 5,271<br />

Total: Operating Expenses 104,596 42,716 66,621 55,034 51,495<br />

Capital Outlay 0 0 0 0 0<br />

Vehicle Replacement Transfer 5,032 9,606 2,287 2,287 680<br />

Total: Engineering & Inspection 663,086 507,297 434,970 421,605 320,751<br />

<strong>Budget</strong> Highlights<br />

The <strong>FY</strong> 11-<strong>12</strong> budget declined by $114,219 or 26% due to the elimination <strong>of</strong> a vacant Engineering<br />

Manager position and the increased cost allocation <strong>of</strong> 2 employees funded by the Stormwater Utility Fund.<br />

Funding from the General Fund for the Engineer II was lowered from 100% to 75% and from 75% to 25%<br />

for the Special Projects Coordinator and conversely increased to the Stormwater Utility Fund. The<br />

workforce changes were part <strong>of</strong> the budget reduction measures necessary to bridge the projected $700,000<br />

budget shortfall and to more accurately reflect the time spent by the respective employees in General Fund<br />

vs. Stormwater Fund related activities.<br />

Operating expenses are down by $15,000 as most line item accounts except for utilities were reduced. The<br />

lower vehicle replacement transfer reflects the citywide recalculation coupled with a reduction in the<br />

number <strong>of</strong> vehicles previously assigned to this program.<br />

As is the case for all general employees, funding is included in the <strong>FY</strong> <strong>12</strong> budget for a 2% wage increase<br />

as <strong>of</strong> April 1, and health insurance premiums reflect the citywide 5% reduction.<br />

280

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!