03.01.2015 Views

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DOWNTOWN AND ECONOMIC DEVELOPMENT IMPROVEMENTS<br />

<strong>FY</strong> 11-<strong>12</strong> <strong>FY</strong> <strong>12</strong>-13 <strong>FY</strong> 13-14 <strong>FY</strong> 14-15 <strong>FY</strong> 15-16 TOTAL<br />

New Downtown Center Infrastructure<br />

-Construction Inspection Services - 159,600 68,400 - - 228,000<br />

-Intersection Improvements/Signalization - 32,850 438,000 - - 470,850<br />

-<strong>Oviedo</strong> Circle - 2,510,775 - - - 2,510,775<br />

-<strong>Oviedo</strong> Court - 678,393 - - - 678,393<br />

-<strong>Oviedo</strong> Way - - 783,770 - - 783,770<br />

-Landscaping, Hardscaping & Streetlighting - - 2,163,843 - - 2,163,843<br />

-Amphitheatre 347,372 1,673,720 1,800,000 - - 3,821,092<br />

-Community Park - 673,885 2,464,452 - - 3,138,337<br />

Sub Total: New Downtown Center Infrastructure 347,372 5,729,223 7,718,465 - - 13,795,060<br />

Total: Downtown and ED Improvements 347,372 5,729,223 7,718,465 - - 13,795,060<br />

GENERAL FACILITIES IMPROVEMENTS<br />

Public Works Complex<br />

- Metal Building Renovations 71,678 - - - - 71,678<br />

- Equipment Storage Bays 173,000 - - - - 173,000<br />

- Vehicle Wash System 71,268 - - - - 71,268<br />

- Fleet building Equipment and Furnishings 52,865 - - - - 52,865<br />

Sub Total: Public Works Complex 368,811 - - - - 368,811<br />

Police Headquarters Building<br />

- Preliminary Design 104,000 - - - - 104,000<br />

- Engineering/Design 325,000 - - - - 325,000<br />

- General Conditions - - 225,000 - - 225,000<br />

-Site Work - - 572,250 - - 572,250<br />

- Construction - New Facility - - 1,259,748 3,779,242 - 5,038,990<br />

- Inspections/Testing - - 25,000 25,000 - 50,000<br />

- Furniture, Fixtures, and Equipment - - - 400,000 - 400,000<br />

- Renovation <strong>of</strong> Existing Public Safety Building - - 100,000 325,000 975,000 1,400,000<br />

- Furniture, Fixtures, and Equipment - - - - 104,000 104,000<br />

Sub Total: Police Headquarters Building (new) 429,000 - 2,181,998 4,529,242 1,079,000 8,219,240<br />

HVAC Replacement<br />

- Air Handler Unit - 65,000 - - - 65,000<br />

- Chiller Unit Replacement - 70,000 - - - 70,000<br />

Sub-Total: HVAC Chiller - 135,000 - - - 135,000<br />

Mitchell Hammock Lighting and Beautification<br />

- Engineering/Design - 25,000 - - 25,000<br />

- Landscaping/Hardscape (unfunded) - - 170,000 - 170,000<br />

- Street Lighting (unfunded) - - 265,000 - 265,000<br />

Sub Total: MH Lighting and Beautification - 25,000 435,000 - 460,000<br />

Gateway and Road Beautification<br />

- North Lockwood Rd - - 25,000 - - 25,000<br />

- SR 426 Median - 26,500 - - - 26,500<br />

- CR 419 Medians - - 85,000 - 85,000<br />

Sub Total: Gateway and Road Beautification - 26,500 25,000 85,000 - 136,500<br />

Neighborhood Improvements - ION<br />

- Fence Repair - Round Lake Park 20,000 - - - 20,000<br />

- Electronic Speed Signs - Reed Ave - 10,000 - - - 10,000<br />

- Traffic Calming - Reed Road - 80,000 - - - 80,000<br />

- Landscape Enhancements - Reed Ave - 10,000 - - - 10,000<br />

- Crosswalk/Street Striping and Improved Signage - 10,000 - - - 10,000<br />

- Trash Receptacles and Site Furniture 5,000 - - - 5,000<br />

- Shoulder Grading 10,000 - - - 10,000<br />

Sub Total: Neighborhood Improvements - ION<br />

345<br />

- 145,000 - - - 145,000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!