Series 2010B Utility Revenue Bonds Construction Fund (417)<br />

Beginning Cash and Cash Equivalents 0 0 5,542,8<strong>12</strong> 5,542,8<strong>12</strong> 3,293,716<br />

2008-09 2009-10 2010-11 2010-11 <strong>2011</strong>-<strong>12</strong><br />

REVENUES Actual Actual <strong>Budget</strong> Projection <strong>Budget</strong><br />

Miscellaneous<br />

Revenue Bond Proceeds 0 30,820,000 0 0 0<br />

Interest on Investments 0 3,646 0 50,143 34,000<br />

Miscellaneous 0 0 0 0 0<br />

Sub-Total: Miscellaneous 0 30,823,646 0 50,143 34,000<br />

Interfund Transfer (transfer from)<br />

Transfer from Wastewater Impact Fee Fund (409) 0 0 0 0 0<br />

Appropriated Retained Earnings 5,527,055 3,293,716<br />

TOTAL REVENUES 0 30,823,646 5,527,055 50,143 3,327,716<br />

EXPENDITURES<br />

Bond Issuance Costs<br />

Cost <strong>of</strong> Issuance 0 451,486 0 0 0<br />

Legal and Other Costs 0 <strong>12</strong>3,953 0 0 0<br />

Sub-Total: Bond Issuance Costs 0 575,439 0 0 0<br />

Alafaya Utility System Acquisition<br />

Share <strong>of</strong> Acquisition Cost 0 24,693,755 0 0 0<br />

(see Series 2010A for balance <strong>of</strong> acquisition cost)<br />

Master Planning<br />

Wastewater 0 0 0 62,372 0<br />

Reclaimed 0 0 0 26,527 0<br />

Sub-Total: Master Planning 0 0 0 88,899 0<br />

Capital Improvements<br />

Headworks and Odor Control:<br />

- Construction 0 0 1,919,371 1,958,824 487,037<br />

- Engineering/Design : Odor Control Improvements 0 0 0 19,840 0<br />

- Construction Engineering & Inspection 0 0 100,000 106,446 0<br />

- Permit Fees, Bond and Miscellaneous 0 0 51,369 0 0<br />

Sub-Total: Headworks 0 0 2,070,740 2,085,110 487,037<br />

Sludge Processing Unit 0 0 46,650 46,650 0<br />

Chlorine Regulator 0 0 15,000 19,100 0<br />

Reclaimed System Interconnect 0 11,640 50,000 59,480 0<br />

Radio Read Meters - Little Creek and others as needed 0 0 1<strong>12</strong>,500 0 1<strong>12</strong>,500<br />

Reclaimed Distribution Tie-In (Little Creek) 0 0 100,000 0 100,000<br />

Additional Reclaimed Filtration 0 0 464,000 0 464,000<br />

Tank Rehabilitation 0 0 500,000 0 500,000<br />

Alafaya-<strong>City</strong> Wastewater System Interconnect: 0 0 0 0 0<br />

- Engineering/Design 0 0 150,000 0 150,400<br />

- Construction 0 0 0 0 919,400<br />

Sub-Total: Capital Improvements 0 11,640 3,508,890 2,210,340 2,733,337<br />

Reserve for Future Capital Projects 2,018,165 594,379<br />

TOTAL EXPENDITURES 0 25,280,834 5,527,055 2,299,239 3,327,716<br />

Ending Cash and Cash Equivalents 0 5,542,8<strong>12</strong> 2,033,922 3,293,716 594,379<br />