03.01.2015 Views

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

FY 2011-12 Adopted Budget - City of Oviedo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FY</strong> 11-<strong>12</strong> <strong>FY</strong> <strong>12</strong>-13 <strong>FY</strong> 13-14 <strong>FY</strong> 14-15 <strong>FY</strong> 15-16 TOTAL<br />

Facility Relocation: Fire Station #44 and Memorial Bldg.<br />

Fire Station #44:<br />

- Design - - 200,000 - 200,000<br />

- Construction - - - 1,800,000 - 1,800,000<br />

Memorial Bldg. Relocation - - - 200,000 - 200,000<br />

Sub Total: Facility Relocation - - 200,000 2,000,000 - 2,200,000<br />

Streetscape Improvements<br />

- Construction 350,000 - - - - 350,000<br />

- CEI Services 42,000 - - - - 42,000<br />

Sub Total: Streetscape Improvements 392,000 - - - - 392,000<br />

Energy Efficiency<br />

- Geo-thermal heating/cooling gymnasium 109,289 - - - - 109,289<br />

Sub Total: Energy Efficency 109,289 - - - - 109,289<br />

Total: General Facilities and Improvement 1,299,100 331,500 2,841,998 6,614,242 1,079,000 <strong>12</strong>,165,840<br />

PARKS AND RECREATION IMPROVEMENTS<br />

Master Plan Projects<br />

- Engineerin/Design and Permitting<br />

- Round Lake Park - - 133,000 - 133,000<br />

- Shane Kelly Fields - 139,000 - - - 139,000<br />

- OSC/LongLake - - - 133,000 - 133,000<br />

- Sweetwater Park 116,000 116,000<br />

- Land Acquisition - 400,000 1,100,000 500,000 500,000 2,500,000<br />

- Round Lake Field & Park Renovations (Phase I) - 837,000 - - - 837,000<br />

- Cover Existing Playgrounds - 3<strong>12</strong>,000 3<strong>12</strong>,000 - - 624,000<br />

- Practice Fields - - - - - -<br />

- Multi-purpose Fields (Shane Kelly) - - 1,625,000 1,625,000 - 3,250,000<br />

- <strong>Oviedo</strong> Sports Complex/Long Lake Renovation - - - 1,875,000 1,875,000 3,750,000<br />

Sub Total: Master Plan Projects - 1,688,000 3,170,000 4,133,000 2,491,000 11,482,000<br />

Total: Parks and Recreation Improvements - 1,688,000 3,170,000 4,133,000 2,491,000 11,482,000<br />

TECHNOLOGY IMPROVEMENTS<br />

Geographic Information System<br />

- Database Design (Stormwater Infrastructure) 60,233 - - - - 60,233<br />

- S<strong>of</strong>tware Maintenance 4,540 - - - - 4,540<br />

- ARC-GIS Annual Fee 35,750 - - - - 35,750<br />

- GIS Coordinator 68,848 68,848<br />

- Training 5,000 - - - - 5,000<br />

Sub Total: Geographic Information System 174,371 - - - - 174,371<br />

Digital Radio Compliance<br />

- Portable Radio Replacement - - 216,000 - - 216,000<br />

- Portable Radio Upgrade - 36,000 - - - 36,000<br />

- Dispatch Console Upgrade - 3,000 - - - 3,000<br />

- Dispatch Console Conversion - - - - 200,000 200,000<br />

Sub Total: Digital Radio Compliance - 39,000 216,000 - 200,000 455,000<br />

Total: Technology Improvements 174,371 39,000 216,000 - 200,000 629,371<br />

TRANSPORTATION IMPROVEMENTS<br />

Sidewalk Repair and Connectivity<br />

- Sidewalk Trip and Fall Hazard - Repairs 25,000 25,000 25,000 25,000 25,000 <strong>12</strong>5,000<br />

- New Sidewalks and Connectivity - - 1<strong>12</strong>,547 66,192 - 178,739<br />

Sub Total: Sidewalk Repair and Connectivity 25,000 25,000 137,547 91,192 25,000 303,739<br />

346

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!