fm 44-100 us army air and missile defense operations
fm 44-100 us army air and missile defense operations
fm 44-100 us army air and missile defense operations
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FM <strong>44</strong>-<strong>100</strong><br />
LOGISTICS PREPARATION OF THE THEATER (LPT)<br />
7-32. Logistics preparation of the theater base <strong>and</strong> the COMMZ is a key tool<br />
available to the ASCC <strong>and</strong> his planners in building a flexible theater<br />
strategic operational support plan. It consists of all the actions taken by<br />
logisticians at all echelons to optimize means of logistically supporting the<br />
ASCC’s plan. Means include force structure, resources, <strong>and</strong> strategic lift.<br />
These actions foc<strong>us</strong> on identifying the resources currently available in the<br />
theater for <strong>us</strong>e by friendly forces <strong>and</strong> ensuring access to them. A detailed<br />
logistics estimate of requirements, tempered with logistics preparation of the<br />
theater, allows the comm<strong>and</strong> logistician to advise the ASCC <strong>and</strong> the CINC of<br />
the most effective method of providing support that will not overwhelm the<br />
force or fail to provide adequate <strong>and</strong> timely support.<br />
MANNING<br />
7-33. The G1 or S1 is involved with courses of action analysis <strong>and</strong> operational<br />
planning during all phases of an operation. The G1 or S1 foc<strong>us</strong>es on<br />
personnel service support functions <strong>and</strong> actions th<strong>us</strong> ensuring support during<br />
pre-deployment, deployment, <strong>and</strong> redeployment for war <strong>and</strong> stability <strong>and</strong><br />
support <strong>operations</strong>.<br />
7-34. The foc<strong>us</strong> during planning is personnel readiness <strong>and</strong> maintenance of<br />
unit strength. The G3 or S3 provides the G1 or S1 an OPORD, OPLAN, <strong>and</strong><br />
FRAGO that stipulates the task organization information necessary for<br />
identifying comm<strong>and</strong> <strong>and</strong> control relationships. This information is <strong>us</strong>ed to<br />
accomplish the following:<br />
• Provide accurate strength accountability.<br />
• Determine necessary modular personnel services support (PSS)<br />
packages required for each phase.<br />
• Plan the employment scheme for corps PSS units.<br />
• Determine location of replacement, postal, personnel, finance,<br />
legal, <strong>and</strong> chaplain units <strong>and</strong> teams.<br />
7-35. The G1 or S1 consistently seeks personnel readiness information from<br />
subordinate units, maneuver brigade S1s, aid stations, higher headquarters<br />
special staff, <strong>and</strong> personnel systems reports. The G1 or S1 analyzes all<br />
available data <strong>and</strong> information <strong>and</strong> provides the comm<strong>and</strong>er a personnel<br />
estimate reflecting the unit's current combat capabilities, projected future<br />
capabilities, <strong>and</strong> requirements in terms of personnel service support. It starts<br />
with the comparison of an organization's personnel strength against its<br />
requirements or authorizations <strong>and</strong> ends with a personnel readiness<br />
assessment <strong>and</strong> appropriate recommendations to the comm<strong>and</strong>er. It m<strong>us</strong>t<br />
consider the impacts of present personnel strength; any critical military<br />
occupational specialty <strong>and</strong> skill level shortages; projected casualties; morale<br />
of soldiers; unique circumstances impacting on personnel readiness that may<br />
not be captured in data; <strong>and</strong> impact of comm<strong>and</strong>er's transportation or<br />
communications priorities. Personnel service support cannot be provided<br />
without transportation <strong>and</strong> communications.<br />
7-7