03.02.2015 Views

Zoning Regulations Amendments through ... - Town of Vernon

Zoning Regulations Amendments through ... - Town of Vernon

Zoning Regulations Amendments through ... - Town of Vernon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TOWN OF VERNON<br />

ZONING REGULATIONS<br />

5.2.6 As-built elevations and levels to which any flood pro<strong>of</strong>ing is effective must be<br />

submitted to the Building Inspector who shall maintain these records.<br />

5.3 The following minimum requirements apply in specific zones designated on the<br />

Flood Insurance Rate Map (F.I.R.M.):<br />

5.3.1 In unnumbered A zones, the developer and the Building Official shall obtain,<br />

review, and reasonably utilize, base flood elevation and floodway data from<br />

alternative sources, prior to its being provided by FIA (Federal Insurance<br />

Administration) <strong>through</strong> its Flood Insurance Rate Study, as criteria for requiring<br />

that the standards <strong>of</strong> Sections 5.3.2, 5.3.3, and 5.5 be met.<br />

5.3.2 In Zones A1-30, AE, or AH, new construction and substantial improvements,<br />

must meet the following standards<br />

5.3.2.1 Residential structures shall have the lowest floor (including basement)<br />

elevated to or above the base flood level.<br />

5.4.2.2 Nonresidential structures shall have the lowest floor (including<br />

basement) elevated to or above the base flood level; or to be flood<br />

pro<strong>of</strong>ed to or above that level provided the standards <strong>of</strong> Section 5.3.3 are<br />

met.<br />

5.3.3 FLOOD PROOFING: Non-residential structure located in all A-zones may be<br />

flood pro<strong>of</strong>ed in lieu <strong>of</strong> being elevated provided that together with all attendant<br />

utilities and sanitary facilities the areas <strong>of</strong> the structure below the required<br />

elevation are water tight with walls substantially impermeable to the passage <strong>of</strong><br />

water, and use structural components having the capability <strong>of</strong> resisting<br />

hydrostatic and hydrodynamic loads and the effect <strong>of</strong> buoyancy. A registered<br />

pr<strong>of</strong>essional engineer or architect shall review and/or develop structural designs,<br />

specifications, and shall certify that the design and methods <strong>of</strong> construction which<br />

are in accordance with acceptable standards <strong>of</strong> practice for meeting the<br />

provisions <strong>of</strong> this subsection.<br />

5.3.4 All manufactured homes (including “mobile” homes placed on a site for one<br />

hundred eighty (180) consecutive days or longer) to be placed or substantially<br />

improve shall be:<br />

5.3.4.1 Elevated so that the lowest floor is above the base flood elevation; and<br />

5.3.4.2 Placed on a permanent foundation which itself is securely anchored<br />

and to which the structure is securely anchored so that it will resist<br />

flotation, lateral movement, and hydrostatic and hydrodynamic<br />

pressures. Anchoring may include, but not be limited to, the use <strong>of</strong><br />

over the top or frame ties to ground anchors.<br />

10/02/2006 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!