03.02.2015 Views

Zoning Regulations Amendments through ... - Town of Vernon

Zoning Regulations Amendments through ... - Town of Vernon

Zoning Regulations Amendments through ... - Town of Vernon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TOWN OF VERNON<br />

ZONING REGULATIONS<br />

SECTION 18 – ACTIVITIES REQUIRING A CERTIFIED<br />

EROSION AND SEDIMENT CONTROL PLAN<br />

18.1 A soil erosion and sediment control plan shall be submitted with any application<br />

for development when the disturbed area <strong>of</strong> such development is cumulatively more<br />

than one-half acre.<br />

18.2 A single family dwelling that is not a part <strong>of</strong> subdivision <strong>of</strong> land shall be exempt<br />

from these soil erosion and sediment control regulations.<br />

18.3 Erosion and Sediment Control Plan<br />

18.3.1 To be eligible for certification, a soil erosion and sediment control plan shall<br />

contain proper provisions to adequately control accelerated erosion and<br />

sedimentation and reduce the danger from storm water run<strong>of</strong>f on the<br />

proposed site based on the best available technology. Such principles,<br />

methods and practices necessary for certification are found in the<br />

Connecticut Guidelines for Soil Erosion and Sediment Control (1985) as<br />

amended. Alternative principles, methods and practices may be used with<br />

prior approval <strong>of</strong> the Commission.<br />

18.3.2 Said plan shall contain, but not be limited to:<br />

18.2.3.1 A narrative describing:<br />

18.2.3.1.1 The development:<br />

18.3.2.1.2 The schedule for grading and construction activities<br />

including<br />

18.3.2.1.2.1 Start and completion dates;<br />

18.3.2.1.2.2 Sequence <strong>of</strong> grading and<br />

construction activities;<br />

18.3.2.1.2.3 Sequence for installation and/or<br />

application <strong>of</strong> soil erosion and<br />

sediment control measures;<br />

18.3.2.1.2.4 Sequence for final stabilization <strong>of</strong><br />

the project site.<br />

18.3.2.1.3 The design criteria details for proposed soil erosion<br />

and sediment control measures and storm water<br />

management facilities.<br />

10/02/2006 155

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!