Works Approval Report.pdf - the National Capital Authority
Works Approval Report.pdf - the National Capital Authority
Works Approval Report.pdf - the National Capital Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyAGENCY NO COMMENTS PROPONENT’SRESPONSEThe Campbell Section 5development will providea shared path alongAnzac Park East, and anew off road routethrough <strong>the</strong> park linkinginto <strong>the</strong> signalisedintersection atWendouree Drive.DATERECEIVEDPedestrian FacilitiesDrawing Number 110029-C1090;The pram crossing at <strong>the</strong>intersection to be to <strong>the</strong> TAMSstandard. The current arrangementwill not prevent vehicles enteringinto <strong>the</strong> footpath.Drawing Number 110029-C1091;show <strong>the</strong> width of <strong>the</strong> pram ramp atmedian island of Road 2(b)Changed to TAMSstandardPram ramp at thislocation is 2.0m x 2.0mLane configurationDrawing Number 110029-C1092;Demonstrate why <strong>the</strong> median islandis required between <strong>the</strong> cycle laneand traffic land;Pedestrian Crossing at <strong>the</strong>intersection of Road 2 (C) andRoad 3; <strong>the</strong> details shown is notadequate;<strong>the</strong> cycle way is located adjoining<strong>the</strong> indented parking bay, no spacefor door opening;2.0m wide pathway is not adequatefor two-way cycle path.Drawing Number 110029-C1093; The proposed roundaboutis at an oblique intersection. Itshould be considered only as apriority control device and not as aspeed control device as approachdeflection cannot be provided in thissituation.Fur<strong>the</strong>r details required for <strong>the</strong>splitter island alignment and linemarkingin order to ensureappropriate deflection through <strong>the</strong>roundabout for <strong>the</strong> design speed.The cycle lane on Road3 is now a shared path.The zebra crossing hasbeen updated to TAMSstandardsThis is now a sharedpath, not a designatedcycleway.As above commentNotedThe horizontal andvertical geometry of <strong>the</strong>roundabout has beendesigned. Full detailswill be submitted for DANovember 2012 Cardno 99