12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyRoad 2-(B)Road DesignMeasurementNotesStreet trees will be planted with a setback of1.5m from <strong>the</strong> kerb line to <strong>the</strong> centre of <strong>the</strong>tree.Street lights will be located between <strong>the</strong> trees.ParkingKerb / Edge Treatment2.6m wideparking baysKerb & GutterSK4A & OCIAll services have been located in <strong>the</strong> verges.Disabled and motorcycle parking is proposed.OCI and SK4A kerbs are proposed at <strong>the</strong>parking bays parallel <strong>the</strong> verge.Kerb and gutter will be used where parking isnot proposed.Kerb Radii and Swept Path 6m Radii It is proposed that kerb returns to adjoiningroads use 6m radii as far as possible. Vehicleswept path drawings (110029/C1923-29)demonstrate <strong>the</strong> design and checking vehiclessatisfactorily completing various movements.Property AccessPedestrians and CyclistsNoneFully accessible and DDA compliantpedestrian crossings will be provided at allintersections and as shown on <strong>the</strong> landscapedrawings.No specific provision is proposed for cyclistson this street; a cycle route is to be providedthrough <strong>the</strong> Park Area.Longitudinal grade 2.11%Table 8.7: - Road 2-(B) ProposalCycle parking is identified on <strong>the</strong> landscapedrawings.November 2012 Cardno 72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!