12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyAnalysis of <strong>the</strong> trunk stormwater network has shown that flooding on Constitution Avenue is largely aresult of overland flow from <strong>the</strong> larger adjacent catchment to <strong>the</strong> east of <strong>the</strong> site and overland flowalong Anzac Parade from Blamey Crescent into Constitution Avenue from <strong>the</strong> west. Overland flowfrom <strong>the</strong> eastern catchment is approximately double that generated by <strong>the</strong> Campbell Section 5catchment. It should be noted that, even if <strong>the</strong> overland flow from Campbell Section 5 werecompletely eliminated, flooding would still occur on Constitution Avenue via overland flows fromAnzac Parade and <strong>the</strong> eastern catchment.Elimination of flooding on Constitution Avenue in a 100 year ARI storm event by detainingstormwater in <strong>the</strong> upstream and adjacent catchments and/or increasing <strong>the</strong> capacity of <strong>the</strong>stormwater network downstream of Constitution Avenue to Lake Burley Griffin are outside <strong>the</strong>reasonable scope of this project. However, proposed improvements within <strong>the</strong> Campbell Section 5site will reduce <strong>the</strong> amount of overland flow reaching <strong>the</strong> Constitution Avenue/Creswell Streetintersection low point and <strong>the</strong>reby provide some reduction, albeit minor, in <strong>the</strong> expected degree ofponding in Constitution Avenue. InfrastructureAs-built drawings have been reviewed and a detail survey has been conducted to establish <strong>the</strong>location and size of stormwater pipe infrastructure through <strong>the</strong> site. To resolve some anomalies, aCCTV camera survey was commissioned to confirm <strong>the</strong> stormwater pipe network.In <strong>the</strong> northwest corner of <strong>the</strong> site at <strong>the</strong> junction of Anzac Park East and Page Street, a manholereduces <strong>the</strong> 1350mm diameter trunk pipeline draining flows from <strong>the</strong> upper catchment to a 1050mmdiameter pipeline. The 1050mm diameter pipeline takes stormwater diagonally through to <strong>the</strong> middleof <strong>the</strong> site, before enlarging to a 1200mm diameter pipe and heading south to align with WendoureeDrive. This pipe network captures several smaller stormwater pipes as it traverses <strong>the</strong> site.Local residents have advised that <strong>the</strong> manhole at <strong>the</strong> intersection of Anzac Park East and PageStreet surcharges in most storm events, which is a direct result of <strong>the</strong> reduction in pipe diameterfrom 1350mm to 1050mm.The existing pipe network and overland flow paths through <strong>the</strong> site are shown in Figure 8.2.November 2012 Cardno 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!