12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development Agency8 Civil, Infrastructure, Servicing and ConstructionManagement8.1 Additional Studies8.1.1 SurveyA detail survey was carried out by LANDdata Surveys Pty Ltd in September 2011. All existing roadinfrastructure such as kerbs, signs, stormwater drains etc. were identified. In addition, all vergefeatures such as service covers, power poles, trees, footpaths etc. were located.8.1.2 Geotechnical investigationContaminationA geotechnical contamination investigation was completed by Douglas Partners Pty Ltd in April2011. Following this, a Remediation Action Plan (RAP) was prepared. A copy of this environmentaland geotechnical report is included in Appendix 3. Ground ConditionsA Geotechnical Investigation was undertaken by Douglas Partners to establish civil engineeringground conditions. This investigation, laboratory testing and associated report providedrecommendations on:Sub-surface conditions;Excavation conditions;The use of <strong>the</strong> site soils as fill and fill construction procedures;Pavement sub-grade conditions and design CBR values;Allowable bearing pressures and settlement performance;Geotechnical factors relevant to construction and site drainage, including batter slopes.8.1.3 Utilities investigationA Dial Before You Dig (DBYD) investigation has been carried out and existing services are detailedon <strong>the</strong> General Arrangement Plans (Drawings 110029/C1201 - 08). In addition, potholing serviceswere conducted in October 2012 to better understand <strong>the</strong> underground site constraints.8.2 Drainage8.2.1 Flood Study and Road DrainageIntroductionCampbell Section 5 is located in a stormwater catchment area of approximately 109ha as shown inFigure 8.1. The stormwater pipe infrastructure within <strong>the</strong> Campbell Section 5 site is <strong>the</strong> responsibilityof <strong>the</strong> NCA as it falls within NCA land, although upstream and downstream of <strong>the</strong> site TAMS isresponsible for <strong>the</strong> network.November 2012 Cardno 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!