12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development Agency6 Transport, Traffic and Planning6.1 Traffic SummaryThe design for <strong>the</strong> Campbell Section 5 development has undergone several iterations, andamendments have been lodged to amend <strong>the</strong> NCP and permitted land use. A traffic analysis waspreviously completed by AECOM and <strong>the</strong> Traffic Analysis and Road Hierarchy <strong>Report</strong> by Cardno(Appendix 2) builds upon this advice.Cardno undertook a comparison of <strong>the</strong> net impact with respect to traffic movements and parkingrequirements for two land use scenarios for Amendment 74 to <strong>the</strong> NCP.The conclusion of this traffic advice is that changing <strong>the</strong> land use to <strong>the</strong> L-Shape, has a negligibleeffect on net traffic and parking generation. The benefit of <strong>the</strong> proposed layout of <strong>the</strong> site is thatvehicles are encouraged to utilise Anzac Park East in preference to Creswell Street, which is a localstreet designed to facilitate local movements only.6.2 External Intersection SummaryThe performance of a key external intersection, <strong>the</strong> proposed roundabout at Getting Crescent /Creswell Street / Campbell Section 5 Access (Road 2-(C)) associated with <strong>the</strong> Campbell Section 5estate, has been assessed to inform <strong>the</strong> design and to highlight future capacity constraints.The results of this preliminary assessment indicate that <strong>the</strong> proposed roundabout at GettingCrescent / Creswell Street / Campbell Section 5 Access (Road 2-(C)) performs satisfactorily duringboth peak periods for <strong>the</strong> projected 2021 design period.6.3 Parking6.3.1 Development code parking requirementsAmendment 74 to <strong>the</strong> NCP revised conditions for <strong>the</strong> provision of car parking associated with <strong>the</strong>Campbell Section 5 development. The Traffic Analysis and Road Hierarchy <strong>Report</strong> undertaken byCardno considers <strong>the</strong> parking requirements for <strong>the</strong> Campbell Section 5 development. Table 6.1summarises <strong>the</strong> car parking rates required under Amendment 74.November 2012 Cardno 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!