12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyGPT. From <strong>the</strong> GPT, <strong>the</strong> 225mm diameter pipeline will discharge <strong>the</strong> redirected low flows to a smallswale with a 1m wide, 0.3m deep deco granite lined base.It is proposed to upgrade <strong>the</strong> existing inlet structures and outlet pipes from <strong>the</strong> road low points inChowne Street and Creswell Street to eliminate overflow in storm events up to at least 5 year ARI.The inlet on Chowne Street will be upgraded to a plantation sump, whilst <strong>the</strong> outlet from CreswellStreet will be upgraded from 600mm diameter to 750mm diameter pipe. Overland Flow PathsThe existing overland flow paths through <strong>the</strong> site will be formalised into a system of small grassedswales. The design of <strong>the</strong> swales will accord with <strong>the</strong> WSUD initiatives presented in Section 5.3.The main grassed swale will extend from <strong>the</strong> northwest corner of <strong>the</strong> site to <strong>the</strong> downstreamheadwall of <strong>the</strong> GPT outlet pipe. As mentioned above, <strong>the</strong> swale downstream of <strong>the</strong> outlet pipe from<strong>the</strong> proposed GPT will contain a 2m wide, 0.3m deep rock lined base. Flows in this downstreamswale will be limited to approximately 0.3m 3 /s in storm events up to 5 year.Retarding BasinA retarding basin is proposed to be excavated within <strong>the</strong> open space system immediately upstreamof Road 2-(B) and Road-(C). The basin will reduce <strong>the</strong> amount of overland flow discharged from <strong>the</strong>site and upstream catchment to <strong>the</strong> Creswell Street/Constitution Avenue low point. Outflows from <strong>the</strong>basin will be discharged by a new 1350mm diameter pipe down Road 3 to <strong>the</strong> existing 1200mmdiameter pipeline at Constitution Avenue. A surcharge structure will be provided at <strong>the</strong> downstreamend of <strong>the</strong> proposed Road 3, which will discharge basin outflows that exceeds <strong>the</strong> capacity of <strong>the</strong>downstream pipeline to <strong>the</strong> Creswell Street/Constitution Avenue low point via Constitution Avenue. Itis estimated that <strong>the</strong> pit will begin to surcharge in approximately a 5 year ARI event and will have amaximum outflow of 0.75m 3 /s at 100 year ARI.Two broad crested weirs will be formed on <strong>the</strong> south eastern side of <strong>the</strong> basin to act as a secondarybasin outlet to discharge flows that exceed <strong>the</strong> basins 100 year ARI capacity or if <strong>the</strong> basin outletstructure or downstream pipeline becomes blocked enough to cause <strong>the</strong> basin to overflow.All paths within <strong>the</strong> basin storage area will be above <strong>the</strong> 2 year ARI water level in accordance withTAMS’ design standards.Proposed Road DrainageThe site’s road drainage system will be designed for a 5 year ARI capacity with sufficient inlet pits toensure that gutter flows in a 100 year ARI storm event do not exceed <strong>the</strong> maximum allowable depthof 200mm.The road drainage systems in Anzac Park East, Road 1-(A) Road 1-(B), and Road 2-(A) will bedischarged into <strong>the</strong> proposed wetland area in <strong>the</strong> retarding basin. The remainder of <strong>the</strong> roaddrainage systems for Road 2-(B) and Road 2-(C) is to be drained to <strong>the</strong> surcharge pit in <strong>the</strong>downstream end of <strong>the</strong> Road 3 median. The carriageway of Road 3 will be graded to directstormwater into <strong>the</strong> median where WSUD measures including tree planting and a bioswale will treat<strong>the</strong> stormwater. This drainage will be connected to <strong>the</strong> existing pipe network in Constitution Avenue.November 2012 Cardno 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!