12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyEasternCatchment230 haCampbell S5Catchment109 haFigure 8.1: Campbell Section 5 Catchment8.2.2 Existing Catchment Conditions Overland flowThe Campbell Section 5 site currently experiences a combined overland flow in a 100 year ARIstorm event of up to 4.8m 3 /s from its intersection with Anzac Park East and Page Street at <strong>the</strong>northwest of <strong>the</strong> site, down to its intersection with Creswell Street and Constitution Avenue in <strong>the</strong>sou<strong>the</strong>ast corner. The principal sources of this overland flow are along Anzac Park East from itsintersection with Blamey Crescent and overflows from road low points adjacent to <strong>the</strong> site in AnzacPark East, Chowne Street and Creswell Street.The stormwater pipe network in Campbell was built in <strong>the</strong> early 1930s and has very little capacitycompared to current design standards. It is estimated that <strong>the</strong> network surcharges in storm eventsgreater than approximately a 6 month ARI, resulting in localised ponding of water on Anzac ParkEast and on Constitution Avenue at its intersection with Creswell Street. In <strong>the</strong> more severe rainevents (greater than 6 month ARI), flooding occurs on Constitution Avenue near its junction withCreswell Street.November 2012 Cardno 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!