12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development Agency8.4.8 Creswell Street(Please refer to drawings 110029/C1312, C2034 – 35B for illustrations of <strong>the</strong> proposals)Figure 8.8 – Plan showing location of Creswell StreetIt is proposed that <strong>the</strong> north western verge on Creswell Street will undergo alterations to provideindented parking.A four-way roundabout is proposed at <strong>the</strong> intersection of Getting Crescent, Creswell Street andRoad 2-(B) to provide access to <strong>the</strong> development. The existing kerb alignments on <strong>the</strong> eastern sideof Creswell Street (adjacent to existing residents and businesses) will be retained as far as possible.A summary of <strong>the</strong> Creswell Street proposals are listed in Table 8.8 below:Creswell StreetRoad DesignTraffic VolumeACT Road ClassificationDesign SpeedMeasurementMinor Collector40 km/hrRoad Reserve 21.2 – 21.4mCarriageway 7.5m3% crossfallVerge (south west side) 6.9m2% crossfallNotesExisting to remainFully paved concrete and granite verge.Street trees will be planted with a setback of1.5m from <strong>the</strong> kerb line to <strong>the</strong> centre of <strong>the</strong>tree.Street lights will be located between <strong>the</strong> trees.All services have been located in <strong>the</strong> verges.November 2012 Cardno 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!