12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyFigure 5.3 – Tall, mature street trees will provide a dense canopy cover in summer5.3 Water Sensitive Urban Design (WSUD)In a water-sensitive precinct, <strong>the</strong> dynamic interactions between water supply, wastewater quality andquantity, stormwater quality and quantity, land use, climate, social capital and <strong>the</strong> receivingwaterways (rivers and bays) are strategically integrated into <strong>the</strong> planning and design process of <strong>the</strong>urban landscape across <strong>the</strong> full spatial scale, from <strong>the</strong> building scale to whole-of city planning.The water sensitive design strategy for <strong>the</strong> Campbell Section 5 site is framed by <strong>the</strong> followingconcepts and design principles:Water efficiency and access to fit-for-purpose water supplyQuality of public spacesClean and healthy water environmentEffective drainage and flood mitigationEfficient and low energy systemsMitigating urban heatNovember 2012 Cardno 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!