Works Approval Report.pdf - the National Capital Authority
Works Approval Report.pdf - the National Capital Authority
Works Approval Report.pdf - the National Capital Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development AgencyFigure 5.3 – Tall, mature street trees will provide a dense canopy cover in summer5.3 Water Sensitive Urban Design (WSUD)In a water-sensitive precinct, <strong>the</strong> dynamic interactions between water supply, wastewater quality andquantity, stormwater quality and quantity, land use, climate, social capital and <strong>the</strong> receivingwaterways (rivers and bays) are strategically integrated into <strong>the</strong> planning and design process of <strong>the</strong>urban landscape across <strong>the</strong> full spatial scale, from <strong>the</strong> building scale to whole-of city planning.The water sensitive design strategy for <strong>the</strong> Campbell Section 5 site is framed by <strong>the</strong> followingconcepts and design principles:Water efficiency and access to fit-for-purpose water supplyQuality of public spacesClean and healthy water environmentEffective drainage and flood mitigationEfficient and low energy systemsMitigating urban heatNovember 2012 Cardno 24