12.07.2015 Views

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

Works Approval Report.pdf - the National Capital Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Campbell Section 5 - <strong>Works</strong> <strong>Approval</strong> Project Ref: 110029Prepared for <strong>the</strong> Land Development Agency8.12.5 GasExistingCurrently Jemena’s medium pressure gas network is located in Creswell Street, Page Street andChowne Street, within verges opposite <strong>the</strong> Campbell Section 5 development. This medium pressuregas pipe network uses a 40mm diameter main.ProposalDiscussions are on going with Jemena with regard to <strong>the</strong> peak demand for gas by <strong>the</strong> CampbellSection 5 development. If sufficient capacity and pressure can be provided by <strong>the</strong> existing networksurrounding <strong>the</strong> site, a feed would be taken from a point near <strong>the</strong> intersection of Creswell Street andGetting Crescent.The gas infrastructure will be provided throughout <strong>the</strong> Campbell Section 5 development in a sharedtrench with street lighting and telecommunications.8.12.6 TelecommunicationsExistingCurrently Telstra, Optus, TransACT, AARNET and NextGen have an underground telecoms networkaround <strong>the</strong> perimeter of <strong>the</strong> site. TransACT and Telstra have infrastructure located in <strong>the</strong> easternverge of Creswell Street and Constitution Avenue. AARNET is located in Anzac Park East andConstitution Avenue. NextGen and Optus infrastructure is installed on Constitution Avenue.It is anticipated that telecommunications services will require relocation/protection on Anzac ParkEast, Creswell Street and Constitution Avenue; however, this will be verified during <strong>the</strong> detaileddesign.ProposalIt is proposed that telecommunications infrastructure will be provided throughout <strong>the</strong> CampbellSection 5 development in a shared trench with street lighting and gas.NBN Co was approached to provide infrastructure into <strong>the</strong> development. It has since been decidedthat TransACT is <strong>the</strong> preferred telecommunications partner and discussions are continuing.November 2012 Cardno 80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!