Sheet C059CORRECTIVE MAINTENANCE SHEETCHANGING A COILFolio 1/13 121 - Preliminary operations• Put the machine in the maintenance configuration (see correspondingparagraph).• Switch off electric power (see corresponding paragraph).2 - Removing a coil• Disconnect the electric connector (2) from the coil concerned.• Unscrew the nut (3) and remove the coil (1).3 - Installing a coil• Put a new coil into place (1) and fix with the nut (3).• Reconnect the electric connector (2) to the coil.• Put the machine back into the operational configuration.• Check proper operation by making the movement corresponding to thereplaced coil.