12.07.2015 Views

h16tp(x - AJ Maskin AS

h16tp(x - AJ Maskin AS

h16tp(x - AJ Maskin AS

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sheet C069CORRECTIVE MAINTENANCE SHEETDISMANTLING / RE-<strong>AS</strong>SEMBLING THE JIBFolio 2/26 - Installing the jib• Put the jib and its cylinder into place and install the articulation pins.• Fix the pins with Mécanindus pins.• Install the 3 stop rings and the contactor SQ2 cam in the positions markedduring dismantling and fix with their bolts.7 - Installing the platform+support assembly• Put the platform+support assembly into place and install the two articulationpins.• Block the pins with new Mécanindus pins.• Install the four pin stop rings and fix using their fixing bolts.• Pass the hydraulic hoses and electric cables along the jib according to themarks made during dismantling and reconnect.• Install the two cable passage collars on the platform and the three collarsalong the length of the jib.• Install and set the contactor SQ2 (see corresponding sheet).• Put the machine back into the operational configuration.• Make several jib lifting, boom lifting and platform rotation movements, topurge the hydraulic circuit.• Check the level of the hydraulic oil tank.12 9 6 7 2 1 410 11 8 3 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!