12.07.2015 Views

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

number <strong>of</strong> cycles during the cooling season from 2,204 to 1,732 cycles: a seasonalreduction <strong>of</strong> 21.4%. The addition <strong>of</strong> a solar water heater in Scenario 4, on the otherhand, resulted in a reduction in the number <strong>of</strong> switching cycles for all three seasons.The SWH <strong>of</strong>fsets part <strong>of</strong> the heating energy required to keep the temperature in thehot water storage tank between 65ºC and 75ºC, which therefore results in a lowernumber <strong>of</strong> switching cycles. A lower number <strong>of</strong> switching cycles <strong>of</strong> course has the(beneficial) effect <strong>of</strong> reducing the system’s maintenance requirement.5.3.2 Auxiliary boilerIn all three proposed plant configurations, the micro-trigeneration system included anauxiliary boiler to cater for periods <strong>of</strong> peak demands. Table 5.7 shows the resultingseasonal and annual auxiliary boiler fuel consumption for the different scenarios.A first important conclusion that can be drawn, is that compared to the fuelconsumption <strong>of</strong> the CHP unit, the fuel consumption <strong>of</strong> the auxiliary boiler waspractically negligible for all scenarios. In fact in none <strong>of</strong> the scenarios investigateddid the annual auxiliary boiler fuel consumption exceed 0.3% <strong>of</strong> the CHP unit annualfuel consumption, suggesting that the use <strong>of</strong> the auxiliary boiler was very sporadic,exclusively to cover for infrequent peak demands. During the simulation process,covering for such peak demands was essential in the process leading to the (integrity<strong>of</strong> the) mathematical iterative process used by the simulation tool to calculate thesolution concentration <strong>of</strong> the weak and strong branch in the absorption chiller (Referto Section 3.3.4.3) – value would diverge rather than converge. In real life coveringfor such short instances <strong>of</strong> peak demands may be superfluous rendering the auxiliaryboiler unnecessary.The only ‘sizeable’ change in auxiliary boiler fuel consumption was caused by theaddition <strong>of</strong> the chilled water storage tank. The addition <strong>of</strong> a chilled water storagetank in Scenario 3 High results in an additional cooling demand which needs to besatisfied, resulting in the auxiliary boiler operating for a longer period <strong>of</strong> time tocover for a higher number <strong>of</strong> peak demands.182

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!