12.07.2015 Views

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

PhD Thesis - Energy Systems Research Unit - University of Strathclyde

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Having discussed the effect that changes in demand have on the present worth <strong>of</strong> aproject, Figure 5.14 shows the effect the different plant configurations used to modelScenarios 3 High (additional chilled water tank) and 4 High (additional SWH) have on thePW <strong>of</strong> the project. For comparative purposes, also shown are the PW plots for thecurrent and high electrical efficiency scenarios <strong>of</strong> the 6 household building with highefficiency fabric (Scenario 2 High/Current efficiency and Scenario 2 High/High efficiency ). Thenegligible difference in PW between the different scenarios suggests that that at theseconditions (and for the selected financial parameters) the physical modificationseffected in the plant configuration do not substantially affect the financialperformance <strong>of</strong> the system. In real terms this means that, for the given conditions andthe level <strong>of</strong> physical modifications effected, the financial aspect is not an importantconsideration when selecting the type <strong>of</strong> plant configuration.Multiple <strong>of</strong> current electricity tariffFig. 5.14 - PW for scenarios with different plant configurations for varyingelectricity tariffsFinally, whereas changing the plant configuration has no effect on the financialperformance <strong>of</strong> the system, comparing the PW plots <strong>of</strong> the scenarios in Scenario 5 Highwith the corresponding ones in Scenario 2 High shows that the way the cogeneratedelectricity is used substantially alters the PW <strong>of</strong> a project. In Figure 5.15 the currentand high efficiency scenarios <strong>of</strong> both Scenario groups 2 High and 5 High are shown.215

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!