2. Loan Agreement<br />

- 94 ­<br />

a. initial CPs (60 days)<br />

(i) Designation of Borrower's Authorized<br />

Representative,<br />

(2) Designation of Project Director<br />

b. SecondaryCPS for All Loan-Funded Project<br />

Activities other than Ad straton 'and<br />

Technolog cal __ort.<br />

(120 days)<br />

(I) Consultant Team Contract,.<br />

(2, General Implementation and Training<br />

Plan specifying approach to phasing oi<br />

activities and tambons under the Project<br />

and giving general time frames and<br />

cost estimates.<br />

(3) Organizational Arrangements including<br />

membership and role of the Committee on<br />

Northeast Rainfed Agricultural Development.<br />

c. CPs for Project Activities W2thin Any Tambon<br />

Except tor personnel placement and related support<br />

activities, meetings/seminars, staff training, srveys and<br />

information services, in a tambon, the Government :hall<br />

furnish to AID in form and substance satisiactory '.o AID, an<br />

area development plan for the tambon sn:wing the expected<br />

activities, the~i criteria for setection, cost estimates and<br />

expected social as weLI as economic impdcLs, their locations<br />

and implementation scheduling, and including the organizational<br />

and staffing requirements for the activities with assurances<br />

these will be satisfied.<br />

d. CP for Construction Activities<br />

Prior to the commencement of any construction<br />

activities for which reimbursement will be sought, the<br />

Government shall furnish to AID in form and substance<br />

satisfactory to AID detailed plans and firm cost estimates<br />

including cost sharing arrangements ot the construction to<br />

be carried out. Such plans shall include inter alia<br />

evidence that a detaiied engineering surveyEas been done<br />

for water resource construction sites, that environmental