- Page 1 and 2:
UNITED STATES INTERNATIONAL DEVELOP
- Page 3 and 4:
Title V Technical Feasibility Analy
- Page 5 and 6:
HH = Household IBRD = International
- Page 7 and 8:
I. Design Team vi Project Design Cr
- Page 9 and 10:
NEROA, MOAC (1981) vii-, Village Le
- Page 11 and 12:
THAILAND UNITED STATES INTERNATIONA
- Page 13 and 14:
I hereby: d. Waivers xi i: Based up
- Page 15 and 16:
1. Addendum to Project Paper A. Org
- Page 17 and 18:
B. Farming Systems and Demonstratio
- Page 19 and 20:
PART I - RECOMMENDATiGNS, SUMMARY.
- Page 21 and 22:
a , itTechnicat ATpep roa it-is n,,
- Page 23 and 24:
stoif timne on thoS- aeas,. This co
- Page 25 and 26:
-7 tCurt etn-iHic n Tha-s 'L.v.ng
- Page 27 and 28:
- 9 - UNiFAO is supporting an an-gs
- Page 29 and 30:
pro3ects primarily--roads, 6arry±n
- Page 31 and 32:
- 13 plant protection inputs. A
- Page 33 and 34:
- 15 b. Utilization of landform
- Page 35 and 36:
- 17 - FIGUI
- Page 37 and 38:
- 19 Proje-,t to tully utilize e
- Page 39 and 40:
- 21 a reduction of specoal "pro
- Page 41 and 42:
- 23 may also be necessary in 2o
- Page 43 and 44:
- 25 tambons will tend to reduce
- Page 45 and 46:
- 27 trials and extension trials
- Page 47 and 48:
- 29 system in its implementatio
- Page 49 and 50:
- 31 (31 Econom:c Development of
- Page 51 and 52:
- 33 based on their technical fe
- Page 53 and 54:
- 35 - The Project will develop an
- Page 55 and 56:
- 37 fo maintenance, utilities,
- Page 57 and 58:
- 39 - PART III - PROJECT ANALYSES
- Page 59 and 60:
- 41 farmgate p:ices are the bes
- Page 61 and 62:
- 43 crops will alr.-zst dob.,e
- Page 63 and 64:
44 provide mo,'e t ta,:tie returns,
- Page 65 and 66:
- 47 - Proposed ctopping system. mo
- Page 67 and 68:
- 49 - Detailed planning during the
- Page 69 and 70:
-51 could be easily identified as
- Page 71 and 72:
- 53 - TEA's fco the 8 PRo~ect tamb
- Page 73 and 74:
- 55 d. SeediSt.ack. Farmers c.t
- Page 75 and 76:
- 57 0, Emphasis on increased pr
- Page 77 and 78:
- 59 - It should be noted that unde
- Page 79 and 80:
- 61 - FIGURE I.t.-Cr - i r',, ; 7
- Page 81 and 82:
- 63 (2, Embankment StLUctUre (D
- Page 83 and 84:
* . *... !,A MV. M4I7 vT S 7 k (CTU
- Page 85 and 86:
- 67 - D. Financial Plan and Arrang
- Page 87 and 88:
C. Revised Budget -69- NI,'4AD l" 1
- Page 89 and 90:
c. Revised Budget A,~ GI ,('.t 1. T
- Page 91 and 92:
Total cost toi ±oan-financed procu
- Page 93 and 94:
-74 A e. Disbursement Procedures.
- Page 95 and 96:
a- Ndtional Level - 76 The .rgon
- Page 97 and 98:
d. D.striCt Level - 78 - The fiel
- Page 99 and 100:
Coimnitte(e os' N61t!,east 1L.i ifL
- Page 101 and 102:
- 82 2. Procedural Arrangements
- Page 103 and 104:
- 84 .Oterest rind capab..it es
- Page 105 and 106:
- 86 3. Second and Succeeding Ye
- Page 107 and 108:
Int iaat onor, t n. c uri-ent im'g
- Page 109 and 110:
C. Evaluation P1n and MontorinjArra
- Page 111 and 112:
- 92 feet inqs--orie oI LWO 'ha
- Page 113 and 114:
2. Loan Agreement - 94 a. initia
- Page 115 and 116:
i-v Addenda to Annexes NERAD ANNEXE
- Page 117 and 118:
-ii - Ill. GUIDELlNES FUR LONU IERM
- Page 119 and 120:
TRAINING -iv- The long-term truinin
- Page 121 and 122:
AC'rloN USAID-5 AMn c -mE I-A •~-
- Page 123 and 124:
UN CLkSSFIED IOWEVER, THERE "I'S UN
- Page 125 and 126:
ANNEX 11-2 suggestions for rained a
- Page 127 and 128:
ANNEX 11-4 computer analysis, beyon
- Page 129 and 130:
4 4 4 E j .'pr.'%:>4'e4'." :t e re.
- Page 131 and 132:
ANNEX IV-3 the, fooding season and
- Page 133 and 134:
FIGURE 3 ANNEX'5 IV-5 RECONAISSANCE
- Page 135 and 136:
iFIfGURE5 RZECONNKJSSANC SOI MAP OF
- Page 137 and 138:
2. Roi Et Province ANNEX IV-9 This
- Page 139 and 140:
FXIGURE RCONNAS81M SQL Iv*A CF TAM
- Page 141 and 142:
FIGURE 1U ANNEX IV-13 AZCONNAISSANC
- Page 143 and 144:
3. Nakhon Phal)om Province ANNEX IV
- Page 145 and 146:
ANNEX IV-17. ;UE--l3,RECONNAISSANCE
- Page 147 and 148:
RECONNAISSANCE SOIL MAP OF TAMBON N
- Page 149 and 150: 4. Si Sa Ket province ANNEX IV-21 T
- Page 151 and 152: FIGURE 18 ANNEX IV-23 am Kam I I I'
- Page 153 and 154: L.'£ UtL 20 - Soil and Land Ceapab
- Page 155 and 156: . . I• , .... , '+ If' S2.Key to
- Page 157 and 158: (Nearest) District-Level Rainfall D
- Page 159 and 160: 5. Tambon-Level Data Summary ANNEX
- Page 161 and 162: Figure 23 a Tambon Level Data Summa
- Page 163 and 164: ANNEX IV-35 Province Si Sa Ket Nakh
- Page 165 and 166: ANNEX V V. Technical FeasLbility An
- Page 167 and 168: ANNEX V-3 with droughl.-toLecrnt cr
- Page 169 and 170: ANNEX V-5 'echihiques 'ich have bee
- Page 171 and 172: HIGH TERRCACE Figure V-I Land Form
- Page 173 and 174: Figure V-3 Estimated Area-/(rai) Pl
- Page 175 and 176: Estimates of Incremental Economic C
- Page 177 and 178: Social Soundness Analysis See Analy
- Page 179 and 180: A. Terehical. Ass.starice Budget DE
- Page 181 and 182: t Travel international 2$1,350 2 Tr
- Page 183 and 184: Salaries Descriptions B. Administra
- Page 185 and 186: Administration and Technical Suppor
- Page 187 and 188: 1 Expendable supplies Descriptions
- Page 189 and 190: Vehicle Administration and Technica
- Page 191 and 192: Act1.vIty /4.2 Graduate Assistatnt
- Page 193 and 194: D. Other Far:ming System Improvemen
- Page 195 and 196: Description Facmer Specialist Train
- Page 197 and 198: *POL - IC Pick-up Truck (25 litre/d
- Page 199: 3. Compost Demonstration Compost Su
- Page 203 and 204: l 2.4 .2.1 2.4.2.1 2.4.2.3 2.4.2.4
- Page 205 and 206: G. Other Agricultural Support - Res
- Page 207 and 208: 1. Demonstration and Research Budge
- Page 209: Evaluation Mini Evaluations (4 stud
- Page 212 and 213: ANNEX X-. t0. FA Sue. 620(o): isher
- Page 214 and 215: fl- t tivLona~od ;I lIuci.tI;tL dei
- Page 216 and 217: . FAA Sec. 62011. WL.I security t;i
- Page 218 and 219: S +. 6. 7. . mt. 8i= " 8. • ANNEX
- Page 220 and 221: production and tle use ANNEX X-11 r
- Page 222 and 223: ANNL. x-13 " provide ait Least 25%
- Page 224 and 225: * 1 . * . A. . ~1. " ...... ; , ':'
- Page 226 and 227: T- C l;* ,I R II ' IONS C. '---R-ES
- Page 228: No. AC 0205/.3,, No. AC 2O5'3 Mr. D