1. Addendum to Project Paper<br />
A. Organizational and Implementational Addenda<br />
II.B.2.e Replicability - p. 21<br />
Once technologies are tested and verified within the<br />
selected tambons, they can be immediately diffused to the other<br />
tambons within those seven amphoes. This can be readily accomplished<br />
within the existing institutional framework since the Kaset<br />
amphoe is intimately involved in the project as a Assistant Field<br />
Manager and as a member the Tambon Agricultural Development<br />
Committee. (of the discussion in ihe addendum on district level<br />
organizational arrangements). Thus, he can diffuse these technologies<br />
to the other tambons within his' domain of responsibility<br />
accordingly a total of approximately 60 tambons will be receiving<br />
technology directly from the NERAD system. Inaddition through the<br />
mechanisms described above, a much border deffusion throughout the<br />
northeast is anticipated during project life.<br />
IV.A. Summary Administrative Analysis - p. 75<br />
After careful study of the project by various de<strong>part</strong>ments<br />
of the MOAC and their concurrency plus the invaluable contributions<br />
by NIDA, it was determined that its comprehensive<br />
nature requires the organizational structure described herein.<br />
The yearly operational reviews will assess its continuing viability,<br />
and adjustments will be duly recommended.<br />
xiv<br />
IV.A.l.e Organizational Arrangements Tambon Level - p.78<br />
The kaset amphoe will also become a member of the<br />
Tambon Agricultural Development Committee. This will strengthen<br />
the institutional arrangements in two ways. First, the Committee<br />
will have immediate access to higher levels of Extension through<br />
the kaset amphoe. And secondly, the replication of proven technologies<br />
can be facilitated to other tambons within his jurisdiction.<br />
IV.A.l.d. Organizational Arrangements District Level - p. 7 8<br />
The assistant field managers will be the kaset<br />
amphoes from the relevant amphoes. This organizational Arrangement<br />
will tie the supervision of the TEA into the regular operating<br />
system yet provide flexibility enough for easy acuess to the<br />
NERAD Project subject matter specialists.