1. Addendum to Project Paper<br />

A. Organizational and Implementational Addenda<br />

II.B.2.e Replicability - p. 21<br />

Once technologies are tested and verified within the<br />

selected tambons, they can be immediately diffused to the other<br />

tambons within those seven amphoes. This can be readily accomplished<br />

within the existing institutional framework since the Kaset<br />

amphoe is intimately involved in the project as a Assistant Field<br />

Manager and as a member the Tambon Agricultural Development<br />

Committee. (of the discussion in ihe addendum on district level<br />

organizational arrangements). Thus, he can diffuse these technologies<br />

to the other tambons within his' domain of responsibility<br />

accordingly a total of approximately 60 tambons will be receiving<br />

technology directly from the NERAD system. Inaddition through the<br />

mechanisms described above, a much border deffusion throughout the<br />

northeast is anticipated during project life.<br />

IV.A. Summary Administrative Analysis - p. 75<br />

After careful study of the project by various de<strong>part</strong>ments<br />

of the MOAC and their concurrency plus the invaluable contributions<br />

by NIDA, it was determined that its comprehensive<br />

nature requires the organizational structure described herein.<br />

The yearly operational reviews will assess its continuing viability,<br />

and adjustments will be duly recommended.<br />

xiv<br />

IV.A.l.e Organizational Arrangements Tambon Level - p.78<br />

The kaset amphoe will also become a member of the<br />

Tambon Agricultural Development Committee. This will strengthen<br />

the institutional arrangements in two ways. First, the Committee<br />

will have immediate access to higher levels of Extension through<br />

the kaset amphoe. And secondly, the replication of proven technologies<br />

can be facilitated to other tambons within his jurisdiction.<br />

IV.A.l.d. Organizational Arrangements District Level - p. 7 8<br />

The assistant field managers will be the kaset<br />

amphoes from the relevant amphoes. This organizational Arrangement<br />

will tie the supervision of the TEA into the regular operating<br />

system yet provide flexibility enough for easy acuess to the<br />

NERAD Project subject matter specialists.