- Page 1: MONITORING AND EVALUATION PLAN THE
- Page 5 and 6: 3. EXECUTIVE SUMMARY The Global Fun
- Page 7 and 8: Following are the objectives behind
- Page 9 and 10: 4. INTRODUCTION World Vision India
- Page 11 and 12: the former head of the National Mon
- Page 13 and 14: � Skills like capacity to conduct
- Page 15 and 16: 5.3 Action Step Recommendation PLAN
- Page 17 and 18: 6. INDICATOR DEFINITIONS AND MEASUR
- Page 19 and 20: 7. ROUTINE DATA COLLECTION, ANALYSI
- Page 21 and 22: where at least 40% of registered TB
- Page 23 and 24: Diagram 2 Finance information/repor
- Page 25 and 26: 7.4 Infrastructures available for d
- Page 27 and 28: Other information products as menti
- Page 29 and 30: disseminate the findings of pilot s
- Page 31 and 32: the performance of the ACSM program
- Page 33 and 34: 9. DATA QUALITY ASSURANCE MECHANISM
- Page 35 and 36: appropriately inclusive. informatio
- Page 37 and 38: RNTCP schemes Checklist 9 Percentag
- Page 39 and 40: Table below describes the Supportiv
- Page 41 and 42: 14. Whether the amounts reported as
- Page 43 and 44: on various occasions to coordinate
- Page 45 and 46: Diagram 4 © World Vision India, Ax
- Page 47 and 48: Action Plan Activity 1.1 M&E Assess
- Page 49 and 50: 1.5.3 Develop reporting format X WV
- Page 51 and 52: Tool workshop with the partners. No
- Page 53 and 54:
2. Collaboration with Coordination
- Page 55 and 56:
13.2 Monitoring and Evaluation Budg
- Page 57 and 58:
ANNEXURE A: M&E Framework Template
- Page 59 and 60:
Percentage of population with corre
- Page 61 and 62:
ANNEXURE B: Indicator Reference She
- Page 63 and 64:
Data collection Quarterly frequency
- Page 65 and 66:
Other relevant information disease
- Page 67 and 68:
Other relevant information proximit
- Page 69 and 70:
Method of Quarterly reporting and r
- Page 71 and 72:
20 Number of sputum samples collect
- Page 73 and 74:
The following report format should
- Page 75 and 76:
Narrative summary of progress (Maxi
- Page 77 and 78:
20 Number of sputum samples collect
- Page 79 and 80:
Most significant change story (Maxi
- Page 81 and 82:
ANNEXURE D: Data Collection Tools T
- Page 83 and 84:
Tool 2: Minutes of Meeting format N
- Page 85 and 86:
Sample identification No.: Name of
- Page 87 and 88:
Tool 6: MDR-TB patients initiated o
- Page 89 and 90:
Tool 8: Monthly Report of MDR-TB pa
- Page 91 and 92:
Name of SR: Name of State: Name of
- Page 93 and 94:
Name of SR: Name of State: Name of
- Page 95 and 96:
Name of SR: Name of State: Name of
- Page 97 and 98:
E Monitoring plan 1 Does the Progra
- Page 99 and 100:
3 Did you find cash in the cash box
- Page 101 and 102:
13 Have TB forums been formed in th
- Page 103 and 104:
Tool 4: Supportive Supervision Chec
- Page 105 and 106:
Tool 6: Supportive Supervision Tool
- Page 107 and 108:
E SL. FINANCIAL RECORDS AND REPORTS
- Page 109 and 110:
19 Are Leave records updated in the
- Page 111 and 112:
SL. ADVANCES/LOANS & OTHER RECEIVAB
- Page 113 and 114:
TOOL 7: SUPPORTIVE SUPERVISION TOOL
- Page 115 and 116:
NO . 1 Is BRS prepared regularly,da
- Page 117 and 118:
. 1 Are the Manager and Accountant
- Page 119 and 120:
6 Are adequate records kept for loc
- Page 121 and 122:
Table 2: Communication Matrix SN Is
- Page 123 and 124:
Standard: Each SR is expected to be
- Page 125 and 126:
© World Vision India, Axshya India
- Page 127 and 128:
3.4.4.1 3 Training 3.4.4.2 3 Traini
- Page 129 and 130:
4.5.4.2 4 4.5.4.3 4 4.5.4.4 4 4.5.4
- Page 131:
ANNEXURE I: Operations Research Des