12.01.2013 Views

MONITORING AND EVALUATION PLAN - TBC India

MONITORING AND EVALUATION PLAN - TBC India

MONITORING AND EVALUATION PLAN - TBC India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

appropriately inclusive. information, or information not<br />

5 Integrity Integrity is when data generated<br />

by a program’s information<br />

systems are protected from<br />

deliberate bias or manipulation for<br />

political or personal reasons<br />

being provided.<br />

M&E Protocols as discussed with<br />

the partners take the data<br />

manipulation as serious offence.<br />

Supportive SR Monitoring by the<br />

PMU would ensure that there is a<br />

data integrity and this is part of the<br />

PMU checklist.<br />

9.2 Human resources and technical capacity needs for data management and for ensuring<br />

data quality.<br />

Capacity in Quality Assurance has been identified as one of the weaknesses during the SR<br />

Assessments and MESS Tool workshop with the partners. None of the SRs have in place quality<br />

assurance practices in their organization. The PR has developed capacity building plan for building SR<br />

capacity in the data quality and data management. Details have been discussed in Section 8: Capacity<br />

Building.<br />

9.3 Plans for assessing consistency of primary data during data analysis.<br />

The table below shows the data source tool for each indicator. The supervisory checklist developed<br />

for the SR Program Manager and M&E Officers at the PMU have been developed to ensure that data<br />

as reported are consistent with the original source of data. For example, number of people trained<br />

is consistent with the number of names in the attendance sheet. The table below describes the<br />

original source of data, and the tool for assessing consistency, along with the person responsible.<br />

Impact and Outcome data is being reported by the National M&E System, and WHO have in place<br />

the mechanism to ensure consistency on those indicators, hence project is not concentrating on<br />

© World Vision <strong>India</strong>, Axshya <strong>India</strong> Project<br />

Monitoring and Evaluation Plan, October 2010 Page No 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!