10.02.2013 Views

2009 Report to Government on National Research and

2009 Report to Government on National Research and

2009 Report to Government on National Research and

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• L<strong>on</strong>g-term stability <strong>and</strong> performance of underground openings.<br />

• L<strong>on</strong>g-term operati<strong>on</strong> <strong>and</strong> maintenance of GDF tunnels <strong>and</strong> shafts.<br />

Geosphere Characterisati<strong>on</strong><br />

A.85 MRWS Stage 5 involves undertaking surface based investigati<strong>on</strong>s at the site of<br />

any proposed GDF (Defra et al., 2008). This is part of the process of geosphere<br />

characterisati<strong>on</strong> which involves obtaining geological, hydrological <strong>and</strong><br />

envir<strong>on</strong>mental data related <str<strong>on</strong>g>to</str<strong>on</strong>g> the development of a GDF. The purpose of<br />

collecting the data is <str<strong>on</strong>g>to</str<strong>on</strong>g> support the development of a safety case <strong>and</strong> will<br />

underpin the engineering design of the facility.<br />

A.86 NDA is currently progressing a Geosphere Characterisati<strong>on</strong> Project which was<br />

started in 2004 by Nirex with the purpose of dem<strong>on</strong>strating that it was practicable<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> characterise a site for development of a GDF. Under the NDA the current aims<br />

of this project are <str<strong>on</strong>g>to</str<strong>on</strong>g> maintain <strong>and</strong> develop an underst<strong>and</strong>ing of the approaches <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

the design <strong>and</strong> implementati<strong>on</strong> of the investigati<strong>on</strong>s (both surface <strong>and</strong> subsurface)<br />

that would be required <strong>and</strong> prepare for such a project.<br />

A.87 The characterisati<strong>on</strong> of a potential site or sites for a GDF is a major multidisciplinary<br />

project requiring a wide range of skills many of which are specialist.<br />

The NDA status report <strong>on</strong> the Geosphere Characterisati<strong>on</strong> Project (NDA, 2007)<br />

indicates <str<strong>on</strong>g>to</str<strong>on</strong>g> CoRWM that the complexity <strong>and</strong> magnitude of the task is recognised<br />

<strong>and</strong> that techniques <strong>and</strong> procedures are being developed <str<strong>on</strong>g>to</str<strong>on</strong>g> deliver the project.<br />

A.88 The status report indicates that site investigati<strong>on</strong>s will be focused <strong>on</strong> obtaining<br />

data that are pertinent <str<strong>on</strong>g>to</str<strong>on</strong>g> the dual tasks of engineering design <strong>and</strong> the<br />

development of a safety case while avoiding data that has no relevance <str<strong>on</strong>g>to</str<strong>on</strong>g> these<br />

objectives. In doing so it will be necessary <str<strong>on</strong>g>to</str<strong>on</strong>g> identify what the data needs are for<br />

the project <strong>and</strong> then establish what the state-of-the-art practices are with respect<br />

<str<strong>on</strong>g>to</str<strong>on</strong>g> data collecti<strong>on</strong>, investigati<strong>on</strong> equipment, analysis, interpretati<strong>on</strong> <strong>and</strong><br />

applicati<strong>on</strong>.<br />

A.89 The Geosphere Characterisati<strong>on</strong> Project will then review these practices <strong>and</strong><br />

their applicability <str<strong>on</strong>g>to</str<strong>on</strong>g> the UK’s range of geology, the proposed disposal c<strong>on</strong>cepts<br />

<strong>and</strong> the availability of skills <strong>and</strong> supporting infrastructure (labora<str<strong>on</strong>g>to</str<strong>on</strong>g>ries etc).<br />

RWMD has started this process by identifying the principal subject areas in which<br />

data will be required <strong>and</strong> it has commenced the assessment of state-of-the-art<br />

practices in some of these. The areas in which data are required have been<br />

identified by review of current <strong>and</strong> previous investigati<strong>on</strong>s both in the UK <strong>and</strong><br />

overseas. The establishment of current best practice in each subject is being<br />

undertaken by the NDA technical supply chain.<br />

A.90 It is CoRWM’s view that the processes established within the Geosphere<br />

Characterisati<strong>on</strong> Project are well planned <strong>and</strong> the objectives are clear. In the<br />

c<strong>on</strong>text of this report, CoRWM’s interest lies in whether the review of state-of-theart<br />

practices in subject areas is effectively highlighting gaps that require R&D,<br />

<strong>and</strong> whether such work is being, or will be, actively pursued.<br />

A.91 CoRWM is aware that the NDA has appointed technical c<strong>on</strong>sultants with a series<br />

of framework c<strong>on</strong>tracts <str<strong>on</strong>g>to</str<strong>on</strong>g> support the development of the Geosphere<br />

CoRWM Document 2543, Oc<str<strong>on</strong>g>to</str<strong>on</strong>g>ber <str<strong>on</strong>g>2009</str<strong>on</strong>g> Page 121 of 151

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!