17.03.2013 Views

or1980v2pt1

or1980v2pt1

or1980v2pt1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

is supported by steel girders spanning<br />

18 metres.<br />

The ACS building is equipped with<br />

all types of modern engineering<br />

facilities. The automated control<br />

centre is serviced by a continuous<br />

power supply, air conditioning, and<br />

gaseous-agent fire-extinguishing systems.<br />

The ACS "Olympiad" building was<br />

designed by Workshop 2 of the<br />

Moscow Research and Design<br />

129<br />

Institute of Cultural, Recreational,<br />

Sports, and Health Facilities.<br />

After the Games were over, the<br />

building was put at the disposal of the<br />

USSR Sports Committee, and its data<br />

processing technology is now used by<br />

the Moscow City Soviet's Executive<br />

Committee for automated control of<br />

the city's utilities and by the USSR<br />

Sports Committee to service major<br />

competitions.<br />

Lounge on a floor<br />

Detail of the staircase<br />

The ACS computer room<br />

Building of ACS "Olympiad"<br />

Second Floor Plan<br />

1. Computer room (second light)<br />

2. OCOG's office<br />

3. Inner yards

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!