10.04.2013 Views

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

102<br />

LEGEND NOTES:<br />

1. Remote device.<br />

2. Transformer connected for 480 v primary 120 v secondary. For other<br />

voltages see chart:<br />

PRIMARY SECONDARY<br />

H1-H2 H1-H3 H1-H4 H1-H5 X1-X2 X1-X3 X1-X4<br />

240 416 480 600 99 120 130<br />

230 400 460 575 95 115 125<br />

LL — Control Power Supply<br />

M — Contactor<br />

OP — Oil Pump<br />

PFCC — Power Factor Correction Capacitor<br />

RES — Resistor<br />

S — Contactor<br />

ST — Shunt Trip<br />

TB — Terminal Block<br />

TC — Transition Contactor<br />

VL — Wire Label<br />

C — Contactor<br />

CB — Circuit Breaker<br />

CP — Control Power<br />

CT — Current Transformer<br />

DS — Disconnect Switch<br />

FU — Fuse<br />

GRD — Ground<br />

HPR — High Pressure Relay<br />

ISM — Integrated <strong>Start</strong>er Module<br />

L — Main Supply Power<br />

220 380 440 550 91 110 120<br />

208 500 85 100 110<br />

3. Current transformer<br />

•amps nameplate ratio<br />

•amps effective ratio with primary turns<br />

•polarity marking<br />

Be sure to connect per polarity markings.<br />

4. “S” - “2M” contactors are electrically <strong>and</strong> mechanically interlocked.<br />

5. Live capacitor unit. Deenergize starter. Wait one (1) minute <strong>and</strong> ground<br />

terminals before servicing.<br />

6. All control wiring 14 gage red except as noted.<br />

Fig. 45 — Allen-Bradley Wye-Delta Unit-Mounted <strong>Start</strong>er (cont)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!