10.04.2013 Views

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Abbreviations <strong>and</strong> Explanations, 4<br />

Adding Refrigerant, 71<br />

Adjusting the Refrigerant Charge, 71<br />

After Extended Shutdown, 67<br />

After Limited Shutdown, 66<br />

Alarm (Trip) Output Contacts, 37<br />

Attach to Network Device Control, 44<br />

Automatic Soft Stop Amps Threshold, 47<br />

Auto. Restart After Power Failure, 38<br />

Before Initial <strong>Start</strong>-<strong>Up</strong>, 48<br />

Capacity Override, 36<br />

Carrier Comfort Network Interface, 54<br />

Changing Oil Filter, 73<br />

Charge Refrigerant Into Chiller, 63<br />

Chilled Water Recycle Mode, 47<br />

Chiller Control Module (CCM), 88<br />

Chiller Dehydration, 53<br />

Chiller Familiarization, 5<br />

Chiller Information Nameplate, 5<br />

Chiller Operating Condition (Check), 65<br />

Chiller Tightness (Check), 48<br />

Chillers with Isolation Valves, 70<br />

Chillers with Storage Tanks, 69<br />

Cold Weather <strong>Operation</strong>, 67<br />

Compressor Bearing <strong>and</strong> Gear <strong>Maintenance</strong>, 74<br />

Condenser, 5<br />

Condenser Freeze Prevention, 38<br />

Condenser Pump Control, 37<br />

Control Algorithms Checkout Procedure, 77<br />

Control Panel, 5<br />

Control Modules, 87<br />

Control Test, 77<br />

Controls, 10<br />

CVC/ICVC <strong>Operation</strong> <strong>and</strong> Menus, 15<br />

Cooler, 5<br />

Default Screen Freeze, 35<br />

Definitions (Controls), 10<br />

Dem<strong>and</strong> Limit Control Option, 39<br />

Design Set Points, (Input), 55<br />

Details (Lubrication Cycle), 8<br />

Display Messages (Check), 76<br />

Dry Run to Test <strong>Start</strong>-<strong>Up</strong> Sequence, 65<br />

Equipment Required, 48<br />

Evaporator Freeze Protection, 38<br />

Extended Shutdown (Preparation for), 66<br />

Factory-Mounted <strong>Start</strong>er or Variable Frequency Drive, 7<br />

General (Controls), 11<br />

General <strong>Maintenance</strong>, 71<br />

Guide Vane Linkage (Check), 72<br />

Heat Exchanger Tubes <strong>and</strong> Flow Devices (Inspect), 74<br />

High Altitude Locations, 63<br />

High Discharge Temperature Control, 36<br />

Ice Build Control, 43<br />

Initial <strong>Start</strong>-<strong>Up</strong>, 64<br />

Initial <strong>Start</strong>-<strong>Up</strong> Checklist for 19XR,XRV Hermetic<br />

Centrifugal Liquid Chiller, CL-1<br />

Inspect the Control Panel, 73<br />

Instruct the Customer Operator, 65<br />

Integrated <strong>Start</strong>er Module (ISM), 88<br />

Introduction, 4<br />

Job Data Required, 48<br />

Kilowatt Output, 37<br />

Lead/Lag Control, 40<br />

Leak Rate, 71<br />

Leak Test Chiller, 50<br />

Local Occupied Schedule (Input), 55<br />

Local <strong>Start</strong>-<strong>Up</strong>, 46<br />

Lubrication Cycle, 8<br />

Lubrication System (Check), 72<br />

Manual Guide Vane <strong>Operation</strong>, 67<br />

INDEX<br />

Motor <strong>and</strong> Lubricating Oil Cooling Cycle, 7<br />

Motor-Compressor, 5<br />

Motor Rotation (Check), 65<br />

Notes on Module <strong>Operation</strong>, 87<br />

Oil Changes, 73<br />

Oil Charge, 55<br />

Oil Cooler, 36<br />

Oil Pressure <strong>and</strong> Compressor Stop (Check), 65<br />

Oil Reclaim Filter, 73<br />

Oil Reclaim System, 8<br />

Oil Specification, 73<br />

Oil Sump Temperature Control, 36<br />

Open Oil Circuit Valves, 48<br />

Operating <strong>Instructions</strong>, 66<br />

Operating the Optional Pumpout Unit, 67<br />

Operator Duties, 66<br />

Optional Pumpout Compressor Water Piping (Check), 53<br />

Optional Pumpout System Controls <strong>and</strong><br />

Compressor (Check), 63<br />

Optional Pumpout System <strong>Maintenance</strong>, 75<br />

Ordering Replacement Chiller Parts, 75<br />

Overview (Troubleshooting Guide), 76<br />

Perform a Control Test, 62<br />

Physical Data, 90<br />

PIC II System Components, 11<br />

PIC II System Functions, 33<br />

Power <strong>Up</strong> the Controls <strong>and</strong> Check the Oil Heater, 55<br />

Preparation (Initial <strong>Start</strong>-<strong>Up</strong>), 64<br />

Preparation (Pumpout <strong>and</strong> Refrigerant Transfer<br />

Procedures), 67<br />

Prepare the Chiller for <strong>Start</strong>-<strong>Up</strong>, 66<br />

Pressure Transducers (Check), 75, 76<br />

Prevent Accidental <strong>Start</strong>-<strong>Up</strong>, 65<br />

Pumpout <strong>and</strong> Refrigerant Transfer Procedures, 67<br />

Ramp Loading, 36<br />

Refrigerant Filter, 73<br />

Refrigerant Float System (Inspect), 74<br />

Refrigerant Leak Detector, 37<br />

Refrigerant Leak Testing, 71<br />

Refrigerant Properties, 71<br />

Refrigerant (Removing), 71<br />

Refrigerant Tracer, 48<br />

Refrigeration Cycle, 7<br />

Refrigeration Log, 67<br />

Relief Valves (Check), 53<br />

Relief Valves <strong>and</strong> Piping (Inspect), 74<br />

Remote Reset of Alarms, 37<br />

Remote <strong>Start</strong>/Stop Controls, 36<br />

Repair the Leak, Retest, <strong>and</strong><br />

Apply St<strong>and</strong>ing Vacuum Test, 72<br />

Replacing Defective Processor Modules, 88<br />

Running System (Check), 66<br />

Safety <strong>and</strong> Operating Controls (Check Monthly), 73<br />

Safety Considerations, 1<br />

Safety Controls, 34<br />

Safety Shutdown, 47<br />

Scheduled <strong>Maintenance</strong>, 73<br />

Service Configurations (Input), 55<br />

Service Ontime, 73<br />

Service <strong>Operation</strong>, 45<br />

Shipping Packaging (Remove), 48<br />

Shunt Trip (Option), 35<br />

Shutdown Sequence, 47<br />

Software Configuration, 55<br />

Solid-State <strong>Start</strong>ers, 88<br />

Spare Safety Inputs, 36<br />

St<strong>and</strong>ing Vacuum Test, 50<br />

<strong>Start</strong>er (Check), 54<br />

<strong>Start</strong>ing Equipment, 9<br />

<strong>Start</strong>ing Equipment (Inspect), 75<br />

123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!