AUX — Auxiliary CB — Circuit Breaker CCM — Chiller Control Module CCN — Carrier Comfort Network COMM — Communications CT — Current Transformer CVC — Chiller Visual Controller DP/DL — Data Port/Data Link DS — Disconnect Switch FD — Fused Disconnect FR — Fan Relay FU — Fuse G — Chassis Ground GV — Guide Vane HGBP — Hot Gas Bypass HPR — High Discharge Pressure Relay HPS — High Pressure Switch HX — Heat Exchanger ICVC — International Chiller Visual Controller IGBT — Insulated Gate Bipolar Transistor IGV — Inlet Guide Vane ISM — Integrated <strong>Start</strong>er Module J — Junction LEM — Current Detector MAB — Module Adapter Board RC — Regulator Controller RMI — Remote Metering Interface ST — Shunt Trip T — Transformer TB — Terminal Block LEGEND FOR FIG. 57 VFD — Variable Frequency Drive 1C — Compressor Oil Heater Contactor 1M — <strong>Start</strong> Contactor 2C — Oil Pump Contactor 3C — Hot Gas Bypass Relay Field Control Wiring Field Power Wiring Factory Wiring Shielded Cable - + Twisted Pair Wiring Male/Female Connector Terminal Block Connection Wire Splice or Junction Cam Switch Component Terminal Thermistor Transducer Fusible Link Potentiometer 122 Pressure Switch Compr Oil Pump Terminal Cartridge Fuse Earth Ground Resistor Chassis Ground Light Temperature Switch Common Potential Dry Contact VFD Terminal Current Transformer, Polarized (Direction Determined by •) Transformer IGBT Diode Silicone Control Rectifier
Abbreviations <strong>and</strong> Explanations, 4 Adding Refrigerant, 71 Adjusting the Refrigerant Charge, 71 After Extended Shutdown, 67 After Limited Shutdown, 66 Alarm (Trip) Output Contacts, 37 Attach to Network Device Control, 44 Automatic Soft Stop Amps Threshold, 47 Auto. Restart After Power Failure, 38 Before Initial <strong>Start</strong>-<strong>Up</strong>, 48 Capacity Override, 36 Carrier Comfort Network Interface, 54 Changing Oil Filter, 73 Charge Refrigerant Into Chiller, 63 Chilled Water Recycle Mode, 47 Chiller Control Module (CCM), 88 Chiller Dehydration, 53 Chiller Familiarization, 5 Chiller Information Nameplate, 5 Chiller Operating Condition (Check), 65 Chiller Tightness (Check), 48 Chillers with Isolation Valves, 70 Chillers with Storage Tanks, 69 Cold Weather <strong>Operation</strong>, 67 Compressor Bearing <strong>and</strong> Gear <strong>Maintenance</strong>, 74 Condenser, 5 Condenser Freeze Prevention, 38 Condenser Pump Control, 37 Control Algorithms Checkout Procedure, 77 Control Panel, 5 Control Modules, 87 Control Test, 77 Controls, 10 CVC/ICVC <strong>Operation</strong> <strong>and</strong> Menus, 15 Cooler, 5 Default Screen Freeze, 35 Definitions (Controls), 10 Dem<strong>and</strong> Limit Control Option, 39 Design Set Points, (Input), 55 Details (Lubrication Cycle), 8 Display Messages (Check), 76 Dry Run to Test <strong>Start</strong>-<strong>Up</strong> Sequence, 65 Equipment Required, 48 Evaporator Freeze Protection, 38 Extended Shutdown (Preparation for), 66 Factory-Mounted <strong>Start</strong>er or Variable Frequency Drive, 7 General (Controls), 11 General <strong>Maintenance</strong>, 71 Guide Vane Linkage (Check), 72 Heat Exchanger Tubes <strong>and</strong> Flow Devices (Inspect), 74 High Altitude Locations, 63 High Discharge Temperature Control, 36 Ice Build Control, 43 Initial <strong>Start</strong>-<strong>Up</strong>, 64 Initial <strong>Start</strong>-<strong>Up</strong> Checklist for 19XR,XRV Hermetic Centrifugal Liquid Chiller, CL-1 Inspect the Control Panel, 73 Instruct the Customer Operator, 65 Integrated <strong>Start</strong>er Module (ISM), 88 Introduction, 4 Job Data Required, 48 Kilowatt Output, 37 Lead/Lag Control, 40 Leak Rate, 71 Leak Test Chiller, 50 Local Occupied Schedule (Input), 55 Local <strong>Start</strong>-<strong>Up</strong>, 46 Lubrication Cycle, 8 Lubrication System (Check), 72 Manual Guide Vane <strong>Operation</strong>, 67 INDEX Motor <strong>and</strong> Lubricating Oil Cooling Cycle, 7 Motor-Compressor, 5 Motor Rotation (Check), 65 Notes on Module <strong>Operation</strong>, 87 Oil Changes, 73 Oil Charge, 55 Oil Cooler, 36 Oil Pressure <strong>and</strong> Compressor Stop (Check), 65 Oil Reclaim Filter, 73 Oil Reclaim System, 8 Oil Specification, 73 Oil Sump Temperature Control, 36 Open Oil Circuit Valves, 48 Operating <strong>Instructions</strong>, 66 Operating the Optional Pumpout Unit, 67 Operator Duties, 66 Optional Pumpout Compressor Water Piping (Check), 53 Optional Pumpout System Controls <strong>and</strong> Compressor (Check), 63 Optional Pumpout System <strong>Maintenance</strong>, 75 Ordering Replacement Chiller Parts, 75 Overview (Troubleshooting Guide), 76 Perform a Control Test, 62 Physical Data, 90 PIC II System Components, 11 PIC II System Functions, 33 Power <strong>Up</strong> the Controls <strong>and</strong> Check the Oil Heater, 55 Preparation (Initial <strong>Start</strong>-<strong>Up</strong>), 64 Preparation (Pumpout <strong>and</strong> Refrigerant Transfer Procedures), 67 Prepare the Chiller for <strong>Start</strong>-<strong>Up</strong>, 66 Pressure Transducers (Check), 75, 76 Prevent Accidental <strong>Start</strong>-<strong>Up</strong>, 65 Pumpout <strong>and</strong> Refrigerant Transfer Procedures, 67 Ramp Loading, 36 Refrigerant Filter, 73 Refrigerant Float System (Inspect), 74 Refrigerant Leak Detector, 37 Refrigerant Leak Testing, 71 Refrigerant Properties, 71 Refrigerant (Removing), 71 Refrigerant Tracer, 48 Refrigeration Cycle, 7 Refrigeration Log, 67 Relief Valves (Check), 53 Relief Valves <strong>and</strong> Piping (Inspect), 74 Remote Reset of Alarms, 37 Remote <strong>Start</strong>/Stop Controls, 36 Repair the Leak, Retest, <strong>and</strong> Apply St<strong>and</strong>ing Vacuum Test, 72 Replacing Defective Processor Modules, 88 Running System (Check), 66 Safety <strong>and</strong> Operating Controls (Check Monthly), 73 Safety Considerations, 1 Safety Controls, 34 Safety Shutdown, 47 Scheduled <strong>Maintenance</strong>, 73 Service Configurations (Input), 55 Service Ontime, 73 Service <strong>Operation</strong>, 45 Shipping Packaging (Remove), 48 Shunt Trip (Option), 35 Shutdown Sequence, 47 Software Configuration, 55 Solid-State <strong>Start</strong>ers, 88 Spare Safety Inputs, 36 St<strong>and</strong>ing Vacuum Test, 50 <strong>Start</strong>er (Check), 54 <strong>Start</strong>ing Equipment, 9 <strong>Start</strong>ing Equipment (Inspect), 75 123