Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Start</strong>-<strong>Up</strong>/Shutdown/Recycle Sequence, 46<br />
<strong>Start</strong> the Chiller, 66<br />
Stop the Chiller, 66<br />
Storage Vessel, 7<br />
Summary (Lubrication Cycle), 8<br />
Surge Prevention Algorithm (Fixed Speed Chiller), 39<br />
Surge Prevention Algorithm with VFD, 40<br />
Surge Protection (Fixed Speed Chillers), 40<br />
Surge Protection VFD Units, 40<br />
System Components, 5<br />
Temperature Sensors (Check), 76<br />
Test After Service, Repair, or Major Leak, 71<br />
Tighten All Gasketed Joints <strong>and</strong> Guide Vane Packing, 48<br />
Tower Fan Relay Low <strong>and</strong> High, 38<br />
Trim Refrigerant Charge, 72<br />
Copyright 2001 Carrier Corporation<br />
INDEX (cont)<br />
Troubleshooting Guide, 76<br />
Unit-Mounted Solid-State <strong>Start</strong>er, 9<br />
Unit-Mounted VFD, 10<br />
Unit-Mounted Wye-Delta <strong>Start</strong>er, 10<br />
Using the Optional Storage Tank <strong>and</strong> Pumpout<br />
System, 48<br />
VFD Cooling Cycle, 8<br />
Water/Brine Reset, 38<br />
Water Leaks, 74<br />
Water Piping (Inspect), 53<br />
Water Treatment, 75<br />
Weekly <strong>Maintenance</strong>, 72<br />
Wiring (Inspect), 53<br />
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice <strong>and</strong> without incurring obligations.<br />
Book 2<br />
PC 211 Catalog No. 531-982 Printed in U.S.A. Form 19XR-5SS Pg 124 6-01 Replaces: 19XR-4SS<br />
Tab 5a