Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AUX — Auxiliary<br />
C — Contactor<br />
CB — Circuit Breaker<br />
CT — Current Transformer<br />
DS — Disconnect Switch<br />
FU — Fuse<br />
G — Ground<br />
LEGEND NOTES:<br />
HPR — High Pressure Relay<br />
ISM — Integrated <strong>Start</strong>er Module<br />
L — Main Supply Power<br />
LL — Control Power Supply<br />
M — Contactor<br />
RES — Resistor<br />
S — Contactor<br />
TB — Terminal Block<br />
1. Power factor correction capacitors (when required) are connected ahead of all current<br />
transformers for proper calibration <strong>and</strong> sensing by the ISM <strong>and</strong> IQDP4130.<br />
2. For phase to phase ground fault protection refer to Fig. 51.<br />
3. For metering information refer to Fig. 52.<br />
Fig. 49 — Cutler-Hammer Wye Delta Unit Mounted <strong>Start</strong>er Sizes 3-5DP<br />
108