10.04.2013 Views

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AUX — Auxiliary<br />

C — Contactor<br />

CB — Circuit Breaker<br />

CT — Current Transformer<br />

DS — Disconnect Switch<br />

FU — Fuse<br />

G — Ground<br />

LEGEND NOTES:<br />

HPR — High Pressure Relay<br />

ISM — Integrated <strong>Start</strong>er Module<br />

L — Main Supply Power<br />

LL — Control Power Supply<br />

M — Contactor<br />

RES — Resistor<br />

S — Contactor<br />

TB — Terminal Block<br />

1. Power factor correction capacitors (when required) are connected ahead of all current<br />

transformers for proper calibration <strong>and</strong> sensing by the ISM <strong>and</strong> IQDP4130.<br />

2. For phase to phase ground fault protection refer to Fig. 51.<br />

3. For metering information refer to Fig. 52.<br />

Fig. 49 — Cutler-Hammer Wye Delta Unit Mounted <strong>Start</strong>er Sizes 3-5DP<br />

108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!