10.04.2013 Views

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VIEW A<br />

LOW SPEED SHAFT THRUST DISK<br />

COMPRESSOR, TRANSMISSION AREA<br />

98<br />

Compressor Assembly Torques<br />

ITEM DESCRIPTION<br />

TORQUE<br />

ft.-lb N m<br />

1* Oil Heater Retaining Nut 20 28<br />

2 Bull Gear Retaining Bolt 80-85 108-115<br />

3 Demister Bolts 15-19 20-26<br />

4 Impeller Retaining Bolt 44-46 60-62<br />

5* Motor Terminals (Low Voltage) 50 68<br />

6* Guide Vane Shaft Seal Nut 25 34<br />

7* Motor Terminals (High Voltage)<br />

— Insulator 2-4 2.7-5.4<br />

— Packing Nut 5 6.8<br />

— Brass Jam Nut 10 13.6<br />

LEGEND<br />

N m — Newton meters<br />

*Not shown.<br />

Fig. 44 — Compressor Fits <strong>and</strong> Clearances<br />

NOTES:<br />

1. All clearances for cylindrical surfaces are diametrical.<br />

2. Dimensions are with rotor in thrust position.<br />

3. Dimensions shown are in inches.<br />

4. Impeller spacing should be performed in accordance with most<br />

recent Carrier Service Bulletin on impeller spacing.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!