Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
Start-Up, Operation, and Maintenance Instructions
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
104<br />
LEGEND (cont)<br />
ISM — Integrated <strong>Start</strong>er Module<br />
L — Main Supply Power<br />
LVG — Leaving<br />
N.O. — Normally Open<br />
PRESS — Pressure<br />
REQM’T — Requirement<br />
TEMP — Temperature<br />
TB — Terminal Board<br />
Denotes Control Panel Terminal<br />
Denotes Oil Pump Terminal<br />
Denotes Power Panel Terminal<br />
Denotes Motor <strong>Start</strong>er Panel Conn.<br />
Denotes Component Terminal<br />
**<br />
Wire Splice<br />
Denotes Conductor<br />
Male/Female Connector<br />
Option Wiring<br />
LEGEND<br />
AUX — Auxiliary<br />
BRG — Bearing<br />
C — Contactor<br />
CB — Circuit Breaker<br />
CCM — Chiller Control Module<br />
CCN — Carrier Comfort Network<br />
COMP’R — Compressor<br />
COND — Condenser<br />
DISCH — Discharge<br />
DL/DP — Datalink or Dataport<br />
ENT — Entering<br />
EVAP — Evaporator<br />
EXT — External<br />
FR — Frame<br />
GND — Ground<br />
G.V. — Guide Vane<br />
HGBP — Hot Gas Bypass<br />
HT EXCH — Heat Exchanger<br />
ICVC — International Chiller Visual Controller<br />
Fig. 46B — Electronic PIC II Control Panel Wiring Schematic For ICVC (Frame 2, 3, 4 Compressor)