10.04.2013 Views

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

Start-Up, Operation, and Maintenance Instructions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

104<br />

LEGEND (cont)<br />

ISM — Integrated <strong>Start</strong>er Module<br />

L — Main Supply Power<br />

LVG — Leaving<br />

N.O. — Normally Open<br />

PRESS — Pressure<br />

REQM’T — Requirement<br />

TEMP — Temperature<br />

TB — Terminal Board<br />

Denotes Control Panel Terminal<br />

Denotes Oil Pump Terminal<br />

Denotes Power Panel Terminal<br />

Denotes Motor <strong>Start</strong>er Panel Conn.<br />

Denotes Component Terminal<br />

**<br />

Wire Splice<br />

Denotes Conductor<br />

Male/Female Connector<br />

Option Wiring<br />

LEGEND<br />

AUX — Auxiliary<br />

BRG — Bearing<br />

C — Contactor<br />

CB — Circuit Breaker<br />

CCM — Chiller Control Module<br />

CCN — Carrier Comfort Network<br />

COMP’R — Compressor<br />

COND — Condenser<br />

DISCH — Discharge<br />

DL/DP — Datalink or Dataport<br />

ENT — Entering<br />

EVAP — Evaporator<br />

EXT — External<br />

FR — Frame<br />

GND — Ground<br />

G.V. — Guide Vane<br />

HGBP — Hot Gas Bypass<br />

HT EXCH — Heat Exchanger<br />

ICVC — International Chiller Visual Controller<br />

Fig. 46B — Electronic PIC II Control Panel Wiring Schematic For ICVC (Frame 2, 3, 4 Compressor)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!