CONTRACTOR after verifying from the completion<br />

documents and satisfying himself that the WORK has been<br />

completed in accordance with and as set out in the<br />

construction and erection drawings, and the CONTRACT<br />

DOCUMENTS.<br />

The CONTRACTOR, after obtaining the COMPLETION<br />

CERTIFICATE, is eligible to present the final bill <strong>for</strong> the<br />

WORK executed by him under the terms <strong>of</strong> CONTRACT.<br />

94.2 COMPLETION CERTIFICATE:<br />

Within one month <strong>of</strong> the completion <strong>of</strong> the WORK in all<br />

respects, the CONTRACTOR shall be furnished with a<br />

certificate by the ENGINEER-IN-CHARGE <strong>of</strong> such<br />

completion, but no certificate shall be given nor shall the<br />

WORK be deemed to have been executed until all<br />

scaffolding, surplus materials and rubbish is cleared <strong>of</strong>f the<br />

SITE completely nor until the WORK shall have been<br />

measured by the ENGINEER-IN-CHARGE whose<br />

measurement shall be binding and conclusive. The WORKS<br />

will not be considered as complete and taken over by the<br />

EMPLOYER, until all the temporary works, labour and staff<br />

colonies are cleared to the satisfaction <strong>of</strong> the<br />

ENGINEER-IN-CHARGE.<br />

If the CONTRACTOR fails to comply with the requirements<br />

<strong>of</strong> this clause on or be<strong>for</strong>e the date fixed <strong>for</strong> the completion <strong>of</strong><br />

the WORK, the ENGINEER-IN-CHARGE may at the<br />

expense <strong>of</strong> the CONTRACTOR remove such scaffolding,<br />

surplus materials and rubbish and dispose <strong>of</strong>f the same as he<br />

thinks fit and clean <strong>of</strong>f such dirt as a<strong>for</strong>esaid, and the<br />

CONTRACTOR shall <strong>for</strong>thwith pay the amount <strong>of</strong> all<br />

expenses so incurred and shall have no claim in respect <strong>of</strong> any<br />

such scaffolding or surplus materials as a<strong>for</strong>esaid except <strong>for</strong><br />

any sum actually realised by the sale there<strong>of</strong>.<br />

94.3 COMPLETION CERTIFICATE DOCUMENTS:<br />

For the purpose <strong>of</strong> Clause 94.0 the following documents will<br />

be deemed to <strong>for</strong>m the completion documents:<br />

i) The technical documents according to which the<br />

WORK was carried out.<br />

ii) Six (6) sets <strong>of</strong> construction drawings showing therein<br />

the modification and correction made during the course<br />

<strong>of</strong> execution and signed by the<br />

ENGINEER-IN-CHARGE.<br />

iii) COMPLETION CERTIFICATE <strong>for</strong> `embedded' and<br />

105